Interconnection queue › New York › Herkimer County
Snapshot of 2026-08-06 · 27 projects · New York (NY)
There are 27 projects in the interconnection queue located in Herkimer County, New York (NY), totalling 2,389 MW across the 27 that publish a capacity.
Get told what moves in Herkimer County, New York
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Herkimer County, New York: what entered, what moved study phase, what came off the list.
Email me Herkimer County, New York queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| NYISO | 27 | 2,389 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| S | 16 | 1,520 MW |
| W | 3 | 213 MW |
| ES | 3 | 61 MW |
| CR | 3 | 590 MW |
| NG | 2 | 4 MW |
| Status | Projects | Capacity |
|---|---|---|
| Withdrawn | 22 | 2,289 MW |
| Active | 5 | 100 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Diamond Solar | NYISO | 500 | Withdrawn | 2022-03-18 | not published |
| Columbia Solar Energy Center | NYISO | 350 | Withdrawn | 2019-05-28 | not published |
| Rocksdrift Energy Center | NYISO | 300 | Withdrawn | 2021-06-16 | not published |
| Swift Solar | NYISO | 300 | Withdrawn | 2022-06-23 | not published |
| 117656 North Creek Solar+Storage | NYISO | 207 | Withdrawn | 2023-09-14 | not published |
| Orion Energy NY I | NYISO | 100 | Withdrawn | 2004-10-12 | not published |
| Goldenrod Solar | NYISO | 90 | Withdrawn | 2018-08-15 | not published |
| Little Falls Solar & BESS | NYISO | 83 | Withdrawn | 2023-02-21 | not published |
| Jordanville Wind | NYISO | 80 | Withdrawn | 2005-04-01 | not published |
| NY48 - Diamond Solar | NYISO | 60 | Withdrawn | 2021-05-17 | not published |
| Dry Lots Wind | NYISO | 33 | Withdrawn | 2011-10-31 | not published |
| Helmer | NYISO | 21 | Withdrawn | 2019-11-14 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| NYISO | 2026-08-06 | 2026-07-16 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.