Interconnection queue › New York › Jefferson County
Snapshot of 2026-08-06 · 35 projects · New York (NY)
There are 35 projects in the interconnection queue located in Jefferson County, New York (NY), totalling 3,252 MW across the 35 that publish a capacity.
Get told what moves in Jefferson County, New York
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Jefferson County, New York: what entered, what moved study phase, what came off the list.
Email me Jefferson County, New York queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| NYISO | 35 | 3,252 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| S | 17 | 1,165 MW |
| W | 10 | 1,643 MW |
| CR | 4 | 400 MW |
| ES | 3 | 29 MW |
| H | 1 | 14 MW |
| Status | Projects | Capacity |
|---|---|---|
| Withdrawn | 29 | 2,723 MW |
| Active | 5 | 379 MW |
| Cluster Study | 1 | 150 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Dutch Gap Wind | NYISO | 250 | Withdrawn | 2007-06-01 | not published |
| Horse Creek Wind | NYISO | 250 | Withdrawn | 2015-12-23 | not published |
| Hounsfield Wind | NYISO | 249 | Withdrawn | 2010-09-07 | not published |
| Hounsfield Wind | NYISO | 245 | Withdrawn | 2007-12-13 | not published |
| Cape Vincent | NYISO | 209 | Withdrawn | 2006-01-12 | not published |
| Bay Breeze Solar | NYISO | 200 | Withdrawn | 2021-12-20 | not published |
| Bay Breeze solar | NYISO | 150 | Cluster Study | 2024-09-20 | 12-2029 |
| Ontario Valley Solar | NYISO | 135 | Withdrawn | 4/26/2021 | not published |
| Horse Creek Wind | NYISO | 126 | Withdrawn | 2005-04-08 | not published |
| Honey Ridge Solar | NYISO | 125 | Withdrawn | 2021-02-15 | not published |
| NY38 Solar | NYISO | 120 | Active | 2019-05-29 | 04-2028 |
| Tracy Solar Energy Center | NYISO | 119 | Active | 2018-10-18 | 12-2028 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| NYISO | 2026-08-06 | 2026-07-16 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.