Interconnection queueNew York › Kings County

Kings County, New York Interconnection Queue

Snapshot of 2026-08-06 · 43 projects · New York (NY)

There are 43 projects in the interconnection queue located in Kings County, New York (NY), totalling 23,495 MW across the 40 that publish a capacity.

Technology in Kings County

Get told what moves in Kings County, New York

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Kings County, New York: what entered, what moved study phase, what came off the list.

Email me Kings County, New York queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
NYISO4323,495 MW (from 40 of 43 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
ES171,811 MW
W1012,639 MW
CT6985 MW
DC45,100 MW
(not published)2not published
OSW11,310 MW
CC11,100 MW
H1550 MW
AC1not published

By status, as published

StatusProjectsCapacity
Withdrawn3620,822 MW (from 33 of 36 projects)
Active41,166 MW
Cluster Study31,507 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Atlantic Shores Offshore Wind Bight 1
ID 1337
NYISO2,100Withdrawn2022-02-25not published
Atlantic Shores Offshore Wind Bight 4
ID 1340
NYISO2,100Withdrawn2022-02-25not published
AGR NY-1
ID 1330
NYISO1,600Withdrawn2022-02-17not published
OW Ocean Winds East 7
ID 1382
NYISO1,600Withdrawn2022-05-02not published
Hera Power Link 1500
ID 1629
NYISO1,500Withdrawn2023-11-02not published
Vineyard Mid-Atlantic 1
ID 1419
NYISO1,350Withdrawn2022-08-24not published
Vineyard Northeast 2
ID 1455
NYISO1,345Withdrawn2022-10-31not published
Bluepoint Wind 1
ID C24-021
NYISO1,310Cluster Study2024-08-0112-2033
Project Neptune DC NB-NYC
ID 0036
NYISO1,200Withdrawn2000-01-21not published
NY City Offshore Wind
ID 0679
NYISO1,200Withdrawn2017-11-07not published
Hera Power Link 1200
ID 1628
NYISO1,200Withdrawn2023-11-02not published
TransGas Energy
ID 0106
NYISO1,100Withdrawn2001-10-05not published

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (4 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
NYISO2026-08-062026-07-16 (unchanged across 4 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.