Interconnection queue › New York › Kings County › Storage
Snapshot of 2026-08-06 · 17 projects
17 storage projects are in the interconnection queue in Kings County, New York, totalling 1,811 MW across the 17 that publish a capacity.
Get told what moves in storage in Kings County, New York
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in storage in Kings County, New York: what entered, what moved study phase, what came off the list.
Email me storage in Kings County, New York queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| NYISO | 17 | 1,811 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| ES | 17 | 1,811 MW |
| Status | Projects |
|---|---|
| Withdrawn | 12 |
| Active | 3 |
| Cluster Study | 2 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Robinson Grid | NYISO | 300 | Withdrawn | 2018-03-13 | not published |
| Solaris Energy Storage | NYISO | 270 | Withdrawn | 2023-02-09 | not published |
| NYC Energy LLC - Phase 2 | NYISO | 220 | Active | 2020-04-22 | 06-2027 |
| Gowanus Energy Storage | NYISO | 150 | Cluster Study | 2024-09-17 | 06-2028 |
| Bloom Energy Storage Center | NYISO | 120 | Withdrawn | 2019-05-20 | not published |
| Gowanus Bay Energy Storage 1 | NYISO | 100 | Withdrawn | 2021-09-03 | not published |
| EI Sunset BESS | NYISO | 100 | Withdrawn | 2021-10-08 | not published |
| Whale Square Energy Storage 2 | NYISO | 96 | Withdrawn | 2021-09-03 | not published |
| NYC Energy | NYISO | 80 | Active | 2015-12-16 | 06-2027 |
| NYC Energy BNY Phase 1 | NYISO | 80 | Withdrawn | 2020-04-20 | not published |
| Whale Square Energy Storage 1 | NYISO | 58 | Withdrawn | 2019-04-15 | not published |
| Bayonne Energy Center III | NYISO | 50 | Active | 2019-04-05 | 07-2027 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| NYISO | 2026-08-06 | 2026-07-16 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.