Interconnection queueNew YorkKings County › Storage

Storage Projects in Kings County, New York

Snapshot of 2026-08-06 · 17 projects

17 storage projects are in the interconnection queue in Kings County, New York, totalling 1,811 MW across the 17 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in storage in Kings County, New York

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in storage in Kings County, New York: what entered, what moved study phase, what came off the list.

Email me storage in Kings County, New York queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
NYISO171,811 MW

By fuel code, as published

FuelProjectsCapacity
ES171,811 MW

By status, as published

StatusProjects
Withdrawn12
Active3
Cluster Study2

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Robinson Grid
ID 0700
NYISO300Withdrawn2018-03-13not published
Solaris Energy Storage
ID 1515
NYISO270Withdrawn2023-02-09not published
NYC Energy LLC - Phase 2
ID 1007
NYISO220Active2020-04-2206-2027
Gowanus Energy Storage
ID C24-178
NYISO150Cluster Study2024-09-1706-2028
Bloom Energy Storage Center
ID 0845
NYISO120Withdrawn2019-05-20not published
Gowanus Bay Energy Storage 1
ID 1240
NYISO100Withdrawn2021-09-03not published
EI Sunset BESS
ID 1272
NYISO100Withdrawn2021-10-08not published
Whale Square Energy Storage 2
ID 1243
NYISO96Withdrawn2021-09-03not published
NYC Energy
ID 0522
NYISO80Active2015-12-1606-2027
NYC Energy BNY Phase 1
ID 1006
NYISO80Withdrawn2020-04-20not published
Whale Square Energy Storage 1
ID 0822
NYISO58Withdrawn2019-04-15not published
Bayonne Energy Center III
ID 0815
NYISO50Active2019-04-0507-2027

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (4 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
NYISO2026-08-062026-07-16 (unchanged across 4 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.