Interconnection queueNew YorkSt. Lawrence County › Solar

Solar Projects in St. Lawrence County, New York

Snapshot of 2026-08-06 · 15 projects

15 solar projects are in the interconnection queue in St. Lawrence County, New York, totalling 822 MW across the 15 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in St. Lawrence County, New York

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in St. Lawrence County, New York: what entered, what moved study phase, what came off the list.

Email me solar in St. Lawrence County, New York queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
NYISO15822 MW

By fuel code, as published

FuelProjectsCapacity
S15822 MW

By status, as published

StatusProjects
Withdrawn12
Active3

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
NY125B - Two Rivers Solar
ID 1184
NYISO200Active2021-05-2009-2028
Gateway Solar Energy Center
ID 0620
NYISO180Active2017-03-2704-2028
Golden Knight Solar
ID 1566
NYISO140Withdrawn2023-06-13not published
Moss Ridge Solar
ID 1150
NYISO60Withdrawn2021-03-16not published
Moss Ridge Solar
ID 1075
NYISO46Withdrawn2020-08-11not published
Richardson Solar
ID 1069
NYISO24Withdrawn2020-08-05not published
Alcoa Solar
ID 0622
NYISO20Withdrawn2017-03-27not published
Fairway Solar
ID 0848
NYISO20Withdrawn2019-05-20not published
Gouverneur Solar Project
ID 0968
NYISO20Withdrawn2020-01-09not published
Morris Solar
ID 1039
NYISO20Withdrawn2021-01-06not published
Chase Mills Solar
ID 1094
NYISO20Withdrawn2020-09-14not published
Abrams Solar
ID 1336
NYISO20Withdrawn2022-02-24not published

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (4 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
NYISO2026-08-062026-07-16 (unchanged across 4 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.