Interconnection queue › New York › Gas
Gas Projects in the New York Interconnection Queue
Snapshot of 2026-09-07 · 66 projects
66 gas projects are in the interconnection queue with a New York location, totaling 26,104 MW across the 64 that publish a capacity.
See what moved in gas in New York each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in gas in New York, from new entries to projects that came off the list.
Email me gas in New York queue changesWork email only. No newsletter, no obligation.
By ISO
By status, as published
| Status | Projects |
|---|---|
| Withdrawn | 62 |
| (not published) | 2 |
| Cluster Study | 2 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| Queens | 10 | 2,824 MW |
| Kings | 7 | 2,085 MW |
| NY | 6 | 3,624 MW |
| NY-NJ | 5 | 2,825 MW |
| Dutchess | 4 | 3,692 MW |
| Richmond | 3 | 160 MW |
| Bronx | 3 | 754 MW |
| Suffolk | 3 | 1,405 MW |
| Nassau | 3 | 618 MW |
| Orange | 2 | 584 MW |
| Rockland | 2 | 1,525 MW |
| Niagara | 2 | 832 MW |
| Herkimer | 2 | 4 MW |
| Albany | 1 | not published |
| Sullivan | 1 | 1,080 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| Linden | NYISO | NY-NJ | 1,200 | Withdrawn | 2006-09-08 | not published |
| Liberty Generating Alternative | NYISO | NY | 1,171 | Withdrawn | 2017-09-15 | not published |
| TransGas Energy | NYISO | Kings | 1,100 | Withdrawn | 2001-10-05 | not published |
| Sullivan County Power Project | NYISO | Sullivan | 1,080 | Withdrawn | 1999-06-25 | not published |
| Cricket Valley Project (QP444 in NYISO Queue) | ISO-NE | Dutchess | 1,020 | not published | 12/18/2014 | 4/18/2020 |
| Cricket Valley Energy Center | NYISO | Dutchess | 1,020 | Withdrawn | 2008-09-22 | not published |
| Combined Cycle (QP310 in NYISO Queue) | ISO-NE | Dutchess | 1,002 | not published | 9/22/2008 | 1/31/2018 |
| Liberty Generation | NYISO | NY | 1,000 | Withdrawn | 2015-10-07 | not published |
| Benchmark Generator | NYISO | Queens | 900 | Withdrawn | 2007-12-20 | not published |
| Linden Power I | NYISO | NY-NJ | 845 | Withdrawn | 2005-08-16 | not published |
| CPV Valley II | NYISO | Wawayanda | 820 | Withdrawn | 2012-02-21 | not published |
| Arthur Kill | NYISO | NY | 800 | Withdrawn | 2007-12-07 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
| NYISO | 2026-09-07 | 2026-08-13 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.