Interconnection queueCalifornia › Kings County

Kings County, California Interconnection Queue

Snapshot of 2026-08-06 · 90 projects · California (CA)

There are 90 projects in the interconnection queue located in Kings County, California (CA), totalling 12,271 MW across the 90 that publish a capacity.

Technology in Kings County

Get told what moves in Kings County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Kings County, California: what entered, what moved study phase, what came off the list.

Email me Kings County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO9012,271 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Solar738,602 MW
Battery102,027 MW
Natural Gas61,492 MW
Wind Turbine1150 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN658,287 MW
COMPLETED171,505 MW
ACTIVE82,479 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
PLUM
ID 1968
CAISO1,000ACTIVE2021-04-15not published
WSP 3
ID 835
CAISO800WITHDRAWN2011-03-31not published
AVENAL ENERGY PROJECT
ID 10
CAISO620WITHDRAWN2001-05-02not published
AVENAL ENERGY PROJECT
ID 254
CAISO600WITHDRAWN2007-08-21not published
VALLEY OAK SOLAR
ID 643H
CAISO600WITHDRAWN2010-07-31not published
OATFIELD HYBRID SOLAR
ID 1592
CAISO500WITHDRAWN2019-04-15not published
PELICANS JAW HYBRID SOLAR
ID 1593
CAISO500ACTIVE2019-04-15not published
MADISON SOLAR
ID 724
CAISO500WITHDRAWN2011-03-31not published
VALLEY SUNLIGHT REFINERY
ID 2004
CAISO400WITHDRAWN2021-04-15not published
JOURNEY STORAGE
ID 1578
CAISO350WITHDRAWN2019-04-15not published
MILKY WAY HYBRID SOLAR
ID 1721
CAISO350WITHDRAWN2020-04-15not published
SLATE
ID 1158
CAISO300COMPLETED2015-04-30not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.