Interconnection queue › California › Kings County › Solar
Snapshot of 2026-08-06 · 73 projects
73 solar projects are in the interconnection queue in Kings County, California, totalling 8,602 MW across the 73 that publish a capacity.
Get told what moves in solar in Kings County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Kings County, California: what entered, what moved study phase, what came off the list.
Email me solar in Kings County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 73 | 8,602 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 73 | 8,602 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 50 |
| COMPLETED | 16 |
| ACTIVE | 7 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| PLUM | CAISO | 1,000 | ACTIVE | 2021-04-15 | not published |
| WSP 3 | CAISO | 800 | WITHDRAWN | 2011-03-31 | not published |
| VALLEY OAK SOLAR | CAISO | 600 | WITHDRAWN | 2010-07-31 | not published |
| OATFIELD HYBRID SOLAR | CAISO | 500 | WITHDRAWN | 2019-04-15 | not published |
| MADISON SOLAR | CAISO | 500 | WITHDRAWN | 2011-03-31 | not published |
| VALLEY SUNLIGHT REFINERY | CAISO | 400 | WITHDRAWN | 2021-04-15 | not published |
| SLATE | CAISO | 300 | COMPLETED | 2015-04-30 | not published |
| DAYLIGHT | CAISO | 300 | ACTIVE | 2016-05-02 | not published |
| AQUAMARINE WESTSIDE | CAISO | 250 | COMPLETED | 2015-04-30 | not published |
| WESTLANDS SOLAR BLUE | CAISO | 250 | COMPLETED | 2015-04-30 | not published |
| KINGSOLAR II | CAISO | 250 | WITHDRAWN | 2010-02-01 | not published |
| WESTLANDS LEMOORE SOLAR | CAISO | 250 | WITHDRAWN | 2011-03-31 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.