Interconnection queueCaliforniaLos Angeles County › Gas

Gas Projects in Los Angeles County, California

Snapshot of 2026-08-06 · 20 projects

20 gas projects are in the interconnection queue in Los Angeles County, California, totalling 9,263 MW across the 20 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in gas in Los Angeles County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in gas in Los Angeles County, California: what entered, what moved study phase, what came off the list.

Email me gas in Los Angeles County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO209,263 MW

By fuel code, as published

FuelProjectsCapacity
Natural Gas209,263 MW

By status, as published

StatusProjects
WITHDRAWN18
COMPLETED2

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
ALAMITOS ENERGY CENTER
ID 939
CAISO1,903WITHDRAWN2012-04-02not published
RIO HONDO POWER
ID 991
CAISO1,047WITHDRAWN2013-04-30not published
CENTER POWER
ID 990
CAISO910WITHDRAWN2013-04-30not published
CARSON HYDROGEN POWER PROJECT (CHPP)
ID 88
CAISO614WITHDRAWN2006-02-10not published
VERNON POWER PLANT
ID 80
CAISO610WITHDRAWN2005-09-12not published
NRG EL SEGUNDO - TOT041
ID 7
CAISO570COMPLETED2000-10-06not published
PALMDALE POWER PLANT
ID 92
CAISO570WITHDRAWN2006-02-23not published
LONG BEACH 5, 6, 7 & 8
ID 207
CAISO557WITHDRAWN2007-04-26not published
REDONDO BEACH ENERGY PROJECT
ID 941
CAISO476WITHDRAWN2012-04-02not published
EL SEGUNDO ENERGY CENTER 2 ( FKA EL SEGUNDO ENERGY CENTER-II)
ID 702
CAISO435WITHDRAWN2011-03-31not published
LONG BEACH PEAKER PROJECT
ID 65
CAISO425WITHDRAWN2005-05-06not published
VERNON POWER PLANT EXPANSION PROJECT
ID 104
CAISO304WITHDRAWN2006-05-03not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.