Interconnection queueCalifornia › Los Angeles County

Los Angeles County, California Interconnection Queue

Snapshot of 2026-08-06 · 142 projects · California (CA)

There are 142 projects in the interconnection queue located in Los Angeles County, California (CA), totalling 31,256 MW across the 142 that publish a capacity.

Technology in Los Angeles County

Get told what moves in Los Angeles County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Los Angeles County, California: what entered, what moved study phase, what came off the list.

Email me Los Angeles County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO14231,256 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Solar645,774 MW
Battery5315,069 MW
Natural Gas209,263 MW
Wind Turbine4650 MW
(not published)1500 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN10922,354 MW
ACTIVE227,436 MW
COMPLETED111,466 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
ALAMITOS ENERGY CENTER
ID 939
CAISO1,903WITHDRAWN2012-04-02not published
ANGELENO SOLAR FARM
ID 1625
CAISO1,150ACTIVE2019-04-15not published
RIO HONDO POWER
ID 991
CAISO1,047WITHDRAWN2013-04-30not published
CENTER POWER
ID 990
CAISO910WITHDRAWN2013-04-30not published
CLEARWATER SOLAR GENERATING STATION
ID 456
CAISO840WITHDRAWN2008-06-02not published
ANTELOPE SOLAR 2
ID 1208
CAISO650ACTIVE2015-04-30not published
CARSON HYDROGEN POWER PROJECT (CHPP)
ID 88
CAISO614WITHDRAWN2006-02-10not published
VERNON POWER PLANT
ID 80
CAISO610WITHDRAWN2005-09-12not published
UNA LAKE SOLAR
ID 1627
CAISO600WITHDRAWN2019-04-15not published
NRG EL SEGUNDO - TOT041
ID 7
CAISO570COMPLETED2000-10-06not published
PALMDALE POWER PLANT
ID 92
CAISO570WITHDRAWN2006-02-23not published
LONG BEACH 5, 6, 7 & 8
ID 207
CAISO557WITHDRAWN2007-04-26not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.