Interconnection queue › California › Los Angeles County › Storage
Storage Projects in Los Angeles County, California
Snapshot of 2026-09-07 · 53 projects
53 storage projects are in the interconnection queue in Los Angeles County, California, totaling 15,069 MW across the 53 that publish a capacity.
See what moved in storage in Los Angeles County, California each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in storage in Los Angeles County, California, from new entries to projects that came off the list.
Email me storage in Los Angeles County, California queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 53 | 15,069 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| Battery | 53 | 15,069 MW |
By status, as published
| Status | Projects |
|---|---|
| WITHDRAWN | 35 |
| ACTIVE | 18 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| ANGELENO SOLAR FARM | CAISO | 1,150 | ACTIVE | 2019-04-15 | not published |
| ANTELOPE SOLAR 2 | CAISO | 650 | ACTIVE | 2015-04-30 | not published |
| UNA LAKE SOLAR | CAISO | 600 | WITHDRAWN | 2019-04-15 | not published |
| SPINDLE ENERGY STORAGE | CAISO | 500 | WITHDRAWN | 2021-04-15 | not published |
| BRADMORE BESS FKA BRADMORE ES | CAISO | 412 | WITHDRAWN | 2015-04-30 | not published |
| TRESTLES ENERGY STORAGE | CAISO | 400 | WITHDRAWN | 2019-04-15 | not published |
| BULLDOG ENERGY STORAGE | CAISO | 400 | WITHDRAWN | 2020-04-15 | not published |
| QUERCUS | CAISO | 400 | WITHDRAWN | 2021-04-15 | not published |
| ADAGIO | CAISO | 400 | WITHDRAWN | 2021-04-15 | not published |
| FLEETWOOD | CAISO | 400 | ACTIVE | 2021-04-15 | not published |
| GABRIEL STORAGE | CAISO | 400 | ACTIVE | 2021-04-15 | not published |
| SIMON | CAISO | 400 | ACTIVE | 2021-04-15 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.