Interconnection queueCalifornia › San Joaquin County

San Joaquin County, California Interconnection Queue

Snapshot of 2026-08-06 · 59 projects · California (CA)

There are 59 projects in the interconnection queue located in San Joaquin County, California (CA), totalling 11,553 MW across the 59 that publish a capacity.

Technology in San Joaquin County

Get told what moves in San Joaquin County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in San Joaquin County, California: what entered, what moved study phase, what came off the list.

Email me San Joaquin County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO5911,553 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Battery254,891 MW
Natural Gas195,392 MW
Solar11805 MW
Wind Turbine2445 MW
Biofuel220 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN448,952 MW
ACTIVE92,075 MW
COMPLETED6526 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
TESLA POWER PLANT
ID 6
CAISO1,156WITHDRAWN2000-08-23not published
CPV CALIFORNIA VIII
ID 236
CAISO630WITHDRAWN2007-06-29not published
BLUE OAK STORAGE
ID 1883
CAISO600WITHDRAWN2021-04-15not published
STOCKTON GENERATION
ID 172
CAISO508WITHDRAWN2007-02-15not published
ALTA CASA STORAGE
ID 1922
CAISO500ACTIVE2021-04-15not published
ROUGH & READY ISLAND ENERGY PARK PROJECT
ID 281
CAISO500WITHDRAWN2007-12-03not published
VELAS
ID 1867
CAISO450WITHDRAWN2021-04-15not published
POTENTIA-VIRIDI
ID 1702
CAISO400ACTIVE2020-04-15not published
ESTANISLAU SOLAR STORAGE
ID 1925
CAISO400WITHDRAWN2021-04-15not published
PATTERSON PASS GT PROJECT
ID 418
CAISO400WITHDRAWN2008-05-30not published
PATTERSON PASS ENERGY CENTER
ID 269
CAISO371WITHDRAWN2007-10-31not published
BRIGHT STAR HYBRID
ID 1541
CAISO350WITHDRAWN2019-04-15not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.