Interconnection queue › California › San Joaquin County › Gas
Snapshot of 2026-08-06 · 19 projects
19 gas projects are in the interconnection queue in San Joaquin County, California, totalling 5,392 MW across the 19 that publish a capacity.
Get told what moves in gas in San Joaquin County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in gas in San Joaquin County, California: what entered, what moved study phase, what came off the list.
Email me gas in San Joaquin County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 19 | 5,392 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Natural Gas | 19 | 5,392 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 15 |
| ACTIVE | 2 |
| COMPLETED | 2 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| TESLA POWER PLANT | CAISO | 1,156 | WITHDRAWN | 2000-08-23 | not published |
| CPV CALIFORNIA VIII | CAISO | 630 | WITHDRAWN | 2007-06-29 | not published |
| STOCKTON GENERATION | CAISO | 508 | WITHDRAWN | 2007-02-15 | not published |
| ROUGH & READY ISLAND ENERGY PARK PROJECT | CAISO | 500 | WITHDRAWN | 2007-12-03 | not published |
| PATTERSON PASS GT PROJECT | CAISO | 400 | WITHDRAWN | 2008-05-30 | not published |
| PATTERSON PASS ENERGY CENTER | CAISO | 371 | WITHDRAWN | 2007-10-31 | not published |
| ISLAND ENERGY CENTER | CAISO | 315 | WITHDRAWN | 2008-05-27 | not published |
| LODI ENERGY CENTER | CAISO | 280 | COMPLETED | 2007-10-23 | not published |
| LODI GENERATING STATION | CAISO | 260 | WITHDRAWN | 2007-09-12 | not published |
| STOCKTON PEAKERS PROJECT | CAISO | 211 | WITHDRAWN | 2007-03-07 | not published |
| ZEPHYR POWER STATION | CAISO | 200 | WITHDRAWN | 2008-03-11 | not published |
| ALBION P3 | CAISO | 169 | WITHDRAWN | 2004-11-29 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.