Interconnection queue › California › Santa Clara County
Snapshot of 2026-08-06 · 25 projects · California (CA)
There are 25 projects in the interconnection queue located in Santa Clara County, California (CA), totalling 3,817 MW across the 25 that publish a capacity.
Get told what moves in Santa Clara County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Santa Clara County, California: what entered, what moved study phase, what came off the list.
Email me Santa Clara County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 25 | 3,817 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| Battery | 24 | 3,697 MW |
| Natural Gas | 1 | 120 MW |
| Status | Projects | Capacity |
|---|---|---|
| WITHDRAWN | 17 | 2,799 MW |
| ACTIVE | 7 | 943 MW |
| COMPLETED | 1 | 75 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| ADA ENERGY STORAGE | CAISO | 500 | WITHDRAWN | 2021-04-15 | not published |
| CREEKSIDE | CAISO | 414 | WITHDRAWN | 2016-05-02 | not published |
| JEWELFLOWER STORAGE | CAISO | 350 | ACTIVE | 2019-04-15 | not published |
| MIRANDA ESS 2 | CAISO | 300 | WITHDRAWN | 2020-04-15 | not published |
| QUICKSILVER ENERGY STORAGE | CAISO | 250 | WITHDRAWN | 2020-04-15 | not published |
| ALVISO ENERGY STORAGE | CAISO | 250 | WITHDRAWN | 2021-04-15 | not published |
| MIRANDA ESS | CAISO | 200 | WITHDRAWN | 2019-04-15 | not published |
| TANAGER STORAGE | CAISO | 200 | ACTIVE | 2019-04-15 | not published |
| RAILYARD ENERGY STORAGE | CAISO | 150 | WITHDRAWN | 2020-04-15 | not published |
| EMPEROR STORAGE | CAISO | 150 | WITHDRAWN | 2021-04-15 | not published |
| AJO POWER BANK | CAISO | 120 | ACTIVE | 2018-04-16 | not published |
| LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION | CAISO | 120 | ACTIVE | 2008-05-28 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.