Interconnection queue › California › Santa Clara County › Storage
Snapshot of 2026-08-06 · 24 projects
24 storage projects are in the interconnection queue in Santa Clara County, California, totalling 3,697 MW across the 24 that publish a capacity.
Get told what moves in storage in Santa Clara County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in storage in Santa Clara County, California: what entered, what moved study phase, what came off the list.
Email me storage in Santa Clara County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 24 | 3,697 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Battery | 24 | 3,697 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 17 |
| ACTIVE | 6 |
| COMPLETED | 1 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| ADA ENERGY STORAGE | CAISO | 500 | WITHDRAWN | 2021-04-15 | not published |
| CREEKSIDE | CAISO | 414 | WITHDRAWN | 2016-05-02 | not published |
| JEWELFLOWER STORAGE | CAISO | 350 | ACTIVE | 2019-04-15 | not published |
| MIRANDA ESS 2 | CAISO | 300 | WITHDRAWN | 2020-04-15 | not published |
| QUICKSILVER ENERGY STORAGE | CAISO | 250 | WITHDRAWN | 2020-04-15 | not published |
| ALVISO ENERGY STORAGE | CAISO | 250 | WITHDRAWN | 2021-04-15 | not published |
| MIRANDA ESS | CAISO | 200 | WITHDRAWN | 2019-04-15 | not published |
| TANAGER STORAGE | CAISO | 200 | ACTIVE | 2019-04-15 | not published |
| RAILYARD ENERGY STORAGE | CAISO | 150 | WITHDRAWN | 2020-04-15 | not published |
| EMPEROR STORAGE | CAISO | 150 | WITHDRAWN | 2021-04-15 | not published |
| AJO POWER BANK | CAISO | 120 | ACTIVE | 2018-04-16 | not published |
| MABU BESS | CAISO | 100 | WITHDRAWN | 2019-04-15 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.