24 storage projects are in the interconnection queue in Santa Clara County, California, totaling 3,697 MW across the 24 that publish a capacity.
See what moved in storage in Santa Clara County, California each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in storage in Santa Clara County, California, from new entries to projects that came off the list.
Email me storage in Santa Clara County, California queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 24 | 3,697 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| Battery | 24 | 3,697 MW |
By status, as published
| Status | Projects |
|---|---|
| WITHDRAWN | 17 |
| ACTIVE | 6 |
| COMPLETED | 1 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| ADA ENERGY STORAGE | CAISO | 500 | WITHDRAWN | 2021-04-15 | not published |
| CREEKSIDE | CAISO | 414 | WITHDRAWN | 2016-05-02 | not published |
| JEWELFLOWER STORAGE | CAISO | 350 | ACTIVE | 2019-04-15 | not published |
| MIRANDA ESS 2 | CAISO | 300 | WITHDRAWN | 2020-04-15 | not published |
| QUICKSILVER ENERGY STORAGE | CAISO | 250 | WITHDRAWN | 2020-04-15 | not published |
| ALVISO ENERGY STORAGE | CAISO | 250 | WITHDRAWN | 2021-04-15 | not published |
| MIRANDA ESS | CAISO | 200 | WITHDRAWN | 2019-04-15 | not published |
| TANAGER STORAGE | CAISO | 200 | ACTIVE | 2019-04-15 | not published |
| RAILYARD ENERGY STORAGE | CAISO | 150 | WITHDRAWN | 2020-04-15 | not published |
| EMPEROR STORAGE | CAISO | 150 | WITHDRAWN | 2021-04-15 | not published |
| AJO POWER BANK | CAISO | 120 | ACTIVE | 2018-04-16 | not published |
| MABU BESS | CAISO | 100 | WITHDRAWN | 2019-04-15 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.