Interconnection queueCalifornia › Tulare County

Tulare County, California Interconnection Queue

Snapshot of 2026-08-06 · 44 projects · California (CA)

There are 44 projects in the interconnection queue located in Tulare County, California (CA), totalling 6,656 MW across the 44 that publish a capacity.

Technology in Tulare County

Get told what moves in Tulare County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Tulare County, California: what entered, what moved study phase, what came off the list.

Email me Tulare County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO446,656 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Solar282,944 MW
Battery163,712 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN304,947 MW
COMPLETED9500 MW
ACTIVE51,210 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
LYCKA SOLAR
ID 1787
CAISO460WITHDRAWN2020-04-15not published
SOLSKEN
ID 2085
CAISO460ACTIVE2021-04-15not published
FRAZIER ES
ID 1210
CAISO412WITHDRAWN2015-04-30not published
SOLAR FARM ENERGY CENTER
ID 2084
CAISO400WITHDRAWN2021-04-15not published
ADASTRA HYBRID SOLAR
ID 2069
CAISO350WITHDRAWN2021-04-15not published
REXFORD SOLAR FARM
ID 1516
CAISO300COMPLETED2018-04-16not published
TRIUMPH SOLAR
ID 1623
CAISO300WITHDRAWN2019-04-15not published
FOUR CREEKS ENERGY STORAGE
ID 2058
CAISO250WITHDRAWN2021-04-15not published
BARRENSPRING
ID 1622
CAISO240WITHDRAWN2019-04-15not published
VESTAL VALLEY
ID 1624
CAISO240WITHDRAWN2019-04-15not published
YELLOW HAY HYBRID SOLAR
ID 1621
CAISO200WITHDRAWN2019-04-15not published
REXFORD 2 SOLAR FARM
ID 1789
CAISO200ACTIVE2020-04-15not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.