Interconnection queue › California › Tulare County › Solar
Snapshot of 2026-08-06 · 28 projects
28 solar projects are in the interconnection queue in Tulare County, California, totalling 2,944 MW across the 28 that publish a capacity.
Get told what moves in solar in Tulare County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Tulare County, California: what entered, what moved study phase, what came off the list.
Email me solar in Tulare County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 28 | 2,944 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 28 | 2,944 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 19 |
| COMPLETED | 8 |
| ACTIVE | 1 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| ADASTRA HYBRID SOLAR | CAISO | 350 | WITHDRAWN | 2021-04-15 | not published |
| REXFORD SOLAR FARM | CAISO | 300 | COMPLETED | 2018-04-16 | not published |
| YELLOW HAY HYBRID SOLAR | CAISO | 200 | WITHDRAWN | 2019-04-15 | not published |
| GILMORE SOLAR | CAISO | 200 | WITHDRAWN | 2021-04-15 | not published |
| CONLOUGE SOLAR | CAISO | 200 | WITHDRAWN | 2021-04-15 | not published |
| MINERAL KING SOLAR | CAISO | 200 | ACTIVE | 2021-04-15 | not published |
| AMARYLLIS SOLAR | CAISO | 200 | WITHDRAWN | 2021-04-15 | not published |
| ARIELLA SOLAR | CAISO | 160 | WITHDRAWN | 2021-04-15 | not published |
| TULARE SOLAR | CAISO | 150 | WITHDRAWN | 2011-03-31 | not published |
| GREAT VALLEY SOLAR | CAISO | 120 | WITHDRAWN | 2011-03-31 | not published |
| GREAT VALLEY SOLAR 2 | CAISO | 120 | WITHDRAWN | 2012-04-02 | not published |
| GV SOLAR 3 | CAISO | 120 | WITHDRAWN | 2013-04-30 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.