Interconnection queueConnecticut › Fairfield County

Fairfield County, Connecticut Interconnection Queue

Snapshot of 2026-08-06 · 63 projects · Connecticut (CT)

There are 63 projects in the interconnection queue located in Fairfield County, Connecticut (CT), totalling 7,045 MW across the 41 that publish a capacity.

Technology in Fairfield County

Get told what moves in Fairfield County, Connecticut

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Fairfield County, Connecticut: what entered, what moved study phase, what came off the list.

Email me Fairfield County, Connecticut queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE637,045 MW (from 41 of 63 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
NG222,270 MW (from 16 of 22 projects)
DFO NG152,162 MW (from 14 of 15 projects)
(not published)11not published
DFO5514 MW (from 3 of 5 projects)
BAT4567 MW
KER2322 MW (from 1 of 2 projects)
N/A21,200 MW (from 1 of 2 projects)
DFO SUB15 MW
SUN15 MW

By status, as published

StatusProjectsCapacity
(not published)637,045 MW (from 41 of 63 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
1200 MW HVDC Line into Singer (Controllable)
ID 899
ISO-NE1,200not published7/29/20199/1/2024
Combined Cycle
ID 369
ISO-NE745not published6/8/20116/1/2016
Combined Cycle
ID 277
ISO-NE695not published9/12/20086/1/2013
Combined Cycle
ID 388
ISO-NE680not published1/13/20125/31/2016
PSEG Bridgeport Harbor CCGT Expansion
ID 412
ISO-NE510not published2/28/20136/10/2019
Gas Turbine
ID 159
ISO-NE325not published6/30/20069/30/2010
Norwalk Harbor Station Redevelopment
ID 125#5cd6436e
ISO-NE322not published11/2/20042/28/2013
Combined Cycle
ID 253
ISO-NE269not published3/11/20086/1/2011
Combustion Turbine
ID 450
ISO-NE245not published3/4/20145/31/2018
Gas Turbine
ID 1393
ISO-NE233not published5/3/20236/1/2026
Waterside Power - 180 MW
ID 104
ISO-NE204not published3/6/200312/31/2011
Battery Storage
ID 1366
ISO-NE201not published3/9/202311/20/2026

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.