Interconnection queue › Connecticut › Fairfield County › Gas
Gas Projects in Fairfield County, Connecticut
Snapshot of 2026-09-07 · 22 projects
22 gas projects are in the interconnection queue in Fairfield County, Connecticut, totaling 2,270 MW across the 16 that publish a capacity.
See what moved in gas in Fairfield County, Connecticut each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in gas in Fairfield County, Connecticut, from new entries to projects that came off the list.
Email me gas in Fairfield County, Connecticut queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 22 | 2,270 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| NG | 22 | 2,270 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 22 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Combined Cycle | ISO-NE | 745 | not published | 6/8/2011 | 6/1/2016 |
| Combined Cycle | ISO-NE | 680 | not published | 1/13/2012 | 5/31/2016 |
| Gas Turbine | ISO-NE | 325 | not published | 6/30/2006 | 9/30/2010 |
| Gas Turbine | ISO-NE | 233 | not published | 5/3/2023 | 6/1/2026 |
| Combustion Turbine | ISO-NE | 102 | not published | 4/25/2016 | 6/1/2019 |
| Bridgeport Energy Uprate | ISO-NE | 84 | not published | 6/16/2014 | 6/5/2015 |
| Fuel Cell | ISO-NE | 29 | not published | 12/5/2006 | 6/1/2009 |
| Bridgeport Energy Wet Compression Upgrade | ISO-NE | 18 | not published | 2/26/2015 | 6/1/2018 |
| Fuel Cell | ISO-NE | 14 | not published | 6/16/2006 | 6/1/2009 |
| Sikorsky Aircraft | ISO-NE | 10 | not published | 1/8/2009 | 10/5/2011 |
| Fuel Cell | ISO-NE | 10 | not published | 1/23/2020 | 12/1/2024 |
| Bridgeport Fuel Cell I | ISO-NE | 6 | not published | 7/25/2012 | 12/22/2013 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.