Interconnection queueConnecticut › New Haven County

New Haven County, Connecticut Interconnection Queue

Snapshot of 2026-08-06 · 65 projects · Connecticut (CT)

There are 65 projects in the interconnection queue located in New Haven County, Connecticut (CT), totalling 4,897 MW across the 45 that publish a capacity.

Technology in New Haven County

Get told what moves in New Haven County, Connecticut

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in New Haven County, Connecticut: what entered, what moved study phase, what came off the list.

Email me New Haven County, Connecticut queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE654,897 MW (from 45 of 65 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
NG19430 MW (from 13 of 19 projects)
BAT142,108 MW
DFO NG101,975 MW (from 7 of 10 projects)
(not published)9not published
SUN440 MW
WAT26 MW
N/A1not published
JF KER1not published
KER NG1197 MW
DFO KER178 MW
DFO KER NG139 MW
DFO124 MW
FC10 MW

By status, as published

StatusProjectsCapacity
(not published)654,897 MW (from 45 of 65 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
CPV Towantic Energy Center
ID 384
ISO-NE745not published12/29/20115/21/2018
Meriden Gas Turbines
ID 222
ISO-NE510not published7/16/20076/1/2015
Towantic Energy
ID 207
ISO-NE452not published4/3/200712/31/2014
Battery Storage
ID 1376
ISO-NE326not published3/29/20234/1/2027
Battery Storage
ID 1486
ISO-NE300not published1/2/20246/30/2027
Battery Storage
ID 1352
ISO-NE263not published2/6/202310/1/2027
Naugatuck Avenue Battery Storage
ID 1089
ISO-NE205not published1/8/202110/31/2028
Battery Storage
ID 1017
ISO-NE200not published4/24/202010/1/2026
Devon Units 15, 16, 17, 18
ID 161
ISO-NE197not published7/5/20066/9/2010
Battery Storage
ID 1208
ISO-NE160not published12/30/202112/31/2024
Battery Storage
ID 1355
ISO-NE136not published2/6/202310/1/2027
Battery Storage
ID 1471
ISO-NE135not published12/12/20231/31/2027

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.