Interconnection queue › Maine › Penobscot County
Snapshot of 2026-08-06 · 50 projects · Maine (ME)
There are 50 projects in the interconnection queue located in Penobscot County, Maine (ME), totalling 1,152 MW across the 41 that publish a capacity.
Get told what moves in Penobscot County, Maine
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Penobscot County, Maine: what entered, what moved study phase, what came off the list.
Email me Penobscot County, Maine queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 50 | 1,152 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| WND | 15 | 245 MW |
| WAT | 9 | 9 MW |
| SUN | 7 | 528 MW |
| NG | 4 | 65 MW |
| BAT | 4 | 263 MW |
| WDS | 3 | 0 MW |
| (not published) | 2 | not published |
| N/A | 2 | not published |
| BLQ WDS | 2 | 32 MW |
| NG WDS | 1 | 10 MW |
| WAT BAT | 1 | 0 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 50 | 1,152 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Solar | ISO-NE | 120 | not published | 5/29/2020 | 12/1/2023 |
| Battery Storage | ISO-NE | 112 | not published | 4/22/2020 | 6/1/2024 |
| Battery Storage | ISO-NE | 112 | not published | 4/22/2020 | 12/1/2024 |
| Solar | ISO-NE | 100 | not published | 9/25/2020 | 11/30/2024 |
| Solar | ISO-NE | 100 | not published | 10/9/2020 | 12/30/2024 |
| Solar | ISO-NE | 100 | not published | 11/17/2020 | 12/30/2024 |
| Solar | ISO-NE | 68 | not published | 2/7/2024 | 7/15/2028 |
| Stetson Wind Phase I | ISO-NE | 60 | not published | 11/22/2006 | 1/22/2009 |
| Passadumkeag Windpark | ISO-NE | 40 | not published | 2/24/2011 | 5/23/2016 |
| Gas Turbine | ISO-NE | 35 | not published | 10/24/2008 | 7/31/2014 |
| Wind Project | ISO-NE | 35 | not published | 7/18/2007 | 12/30/2012 |
| Combined Cycle Uprate | ISO-NE | 30 | not published | 2/27/2015 | 8/1/2018 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.