Interconnection queue › Maine › Penobscot County › Wind
Wind Projects in Penobscot County, Maine
Snapshot of 2026-09-07 · 15 projects
15 wind projects are in the interconnection queue in Penobscot County, Maine, totaling 245 MW across the 15 that publish a capacity.
See what moved in wind in Penobscot County, Maine each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in wind in Penobscot County, Maine, from new entries to projects that came off the list.
Email me wind in Penobscot County, Maine queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 15 | 245 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| WND | 15 | 245 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 15 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Stetson Wind Phase I | ISO-NE | 60 | not published | 11/22/2006 | 1/22/2009 |
| Passadumkeag Windpark | ISO-NE | 40 | not published | 2/24/2011 | 5/23/2016 |
| Wind Project | ISO-NE | 35 | not published | 7/18/2007 | 12/30/2012 |
| Rollins Wind (Stetson Wind Phase II) | ISO-NE | 28 | not published | 11/22/2006 | 7/26/2011 |
| Dundee Wind | ISO-NE | 27 | not published | 10/9/2007 | 7/26/2011 |
| Silver Maple Wind | ISO-NE | 20 | not published | 5/4/2017 | 12/14/2022 |
| Wind | ISO-NE | 20 | not published | 3/10/2008 | 11/1/2010 |
| Pisgah Mountain | ISO-NE | 9 | not published | 10/20/2010 | 12/16/2016 |
| Dundee Wind Increase | ISO-NE | 4 | not published | 5/28/2009 | 7/26/2011 |
| Wind uprate | ISO-NE | 3 | not published | 4/28/2015 | 12/31/2018 |
| Pisgah Mountain Increase (see Q349) | ISO-NE | 0 | not published | 12/6/2012 | 12/16/2016 |
| Silver Maple Wind CNR | ISO-NE | 0 | not published | 4/24/2020 | 12/14/2022 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.