Interconnection queueMainePenobscot County › Wind

Wind Projects in Penobscot County, Maine

Snapshot of 2026-08-06 · 15 projects

15 wind projects are in the interconnection queue in Penobscot County, Maine, totalling 245 MW across the 15 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in wind in Penobscot County, Maine

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in wind in Penobscot County, Maine: what entered, what moved study phase, what came off the list.

Email me wind in Penobscot County, Maine queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE15245 MW

By fuel code, as published

FuelProjectsCapacity
WND15245 MW

By status, as published

StatusProjects
(not published)15

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Stetson Wind Phase I
ID 185
ISO-NE60not published11/22/20061/22/2009
Passadumkeag Windpark
ID 357
ISO-NE40not published2/24/20115/23/2016
Wind Project
ID 221
ISO-NE35not published7/18/200712/30/2012
Rollins Wind (Stetson Wind Phase II)
ID 185#796c1702
ISO-NE28not published11/22/20067/26/2011
Dundee Wind
ID 228
ISO-NE27not published10/9/20077/26/2011
Silver Maple Wind
ID 649
ISO-NE20not published5/4/201712/14/2022
Wind
ID 254
ISO-NE20not published3/10/200811/1/2010
Pisgah Mountain
ID 349
ISO-NE9not published10/20/201012/16/2016
Dundee Wind Increase
ID 301
ISO-NE4not published5/28/20097/26/2011
Wind uprate
ID 547
ISO-NE3not published4/28/201512/31/2018
Pisgah Mountain Increase (see Q349)
ID 403
ISO-NE0not published12/6/201212/16/2016
Silver Maple Wind CNR
ID 1020
ISO-NE0not published4/24/202012/14/2022

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.