Interconnection queueMaine › Somerset County

Somerset County, Maine Interconnection Queue

Snapshot of 2026-08-06 · 40 projects · Maine (ME)

There are 40 projects in the interconnection queue located in Somerset County, Maine (ME), totalling 2,994 MW across the 38 that publish a capacity.

Technology in Somerset County

Get told what moves in Somerset County, Maine

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Somerset County, Maine: what entered, what moved study phase, what came off the list.

Email me Somerset County, Maine queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE402,994 MW (from 38 of 40 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
SUN15911 MW
WND13975 MW
WAT78 MW
(not published)20 MW (from 1 of 2 projects)
N/A21,100 MW
WDS1not published

By status, as published

StatusProjectsCapacity
(not published)402,994 MW (from 38 of 40 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
AC Line to Pittsfield, ME
ID 589
ISO-NE550not published1/11/201612/31/2019
Internal noncontrollable ETU to Pittsfield ME
ID 736
ISO-NE550not published4/12/201812/31/2021
Bingham Wind
ID 333
ISO-NE185not published5/14/201012/13/2016
Solar
ID 1563
ISO-NE165not published6/6/20246/6/2028
Solar
ID 578
ISO-NE152not published11/20/201510/31/2019
Solar
ID 1100
ISO-NE140not published2/19/202111/29/2029
Wind
ID 244
ISO-NE117not published1/3/200812/30/2013
Three Corners Solar
ID 670
ISO-NE110not published7/25/20177/27/2024
Solar
ID 1114
ISO-NE103not published4/1/20211/31/2024
Wind
ID 350#01bc68bf
ISO-NE97not published11/10/201012/31/2016
Wind
ID 621
ISO-NE94not published10/17/20161/15/2020
Wind
ID 739
ISO-NE90not published4/12/20181/30/2020

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.