Interconnection queue › Maine › Somerset County › Solar
Snapshot of 2026-08-06 · 15 projects
15 solar projects are in the interconnection queue in Somerset County, Maine, totalling 911 MW across the 15 that publish a capacity.
Get told what moves in solar in Somerset County, Maine
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Somerset County, Maine: what entered, what moved study phase, what came off the list.
Email me solar in Somerset County, Maine queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 15 | 911 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| SUN | 15 | 911 MW |
| Status | Projects |
|---|---|
| (not published) | 15 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Solar | ISO-NE | 165 | not published | 6/6/2024 | 6/6/2028 |
| Solar | ISO-NE | 152 | not published | 11/20/2015 | 10/31/2019 |
| Solar | ISO-NE | 140 | not published | 2/19/2021 | 11/29/2029 |
| Three Corners Solar | ISO-NE | 110 | not published | 7/25/2017 | 7/27/2024 |
| Solar | ISO-NE | 103 | not published | 4/1/2021 | 1/31/2024 |
| Solar | ISO-NE | 72 | not published | 4/21/2021 | 1/31/2024 |
| Solar | ISO-NE | 52 | not published | 9/21/2023 | 12/15/2027 |
| CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study | ISO-NE | 29 | not published | 2/4/2021 | 4/30/2024 |
| Solar | ISO-NE | 20 | not published | 4/26/2018 | 11/1/2021 |
| Solar | ISO-NE | 20 | not published | 10/9/2019 | 4/1/2027 |
| Solar | ISO-NE | 20 | not published | 11/30/2018 | 4/1/2022 |
| SolarFairfield | ISO-NE | 18 | not published | 12/17/2020 | 6/30/2027 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.