Interconnection queueMaine › York County

York County, Maine Interconnection Queue

Snapshot of 2026-09-07 · 28 projects · Maine (ME)

There are 28 projects in the interconnection queue located in York County, Maine (ME), totaling 707 MW across the 27 that publish a capacity.

Technology in York County

See what moved in York County, Maine each week

The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in York County, Maine, from new entries to projects that came off the list.

Email me York County, Maine queue changes

Work email only. No newsletter, no obligation.

By ISO

ISOProjectsCapacity
ISO-NE28707 MW (from 27 of 28 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.

FuelProjectsCapacity
SUN19594 MW
SUN BAT342 MW
WAT22 MW
(not published)1not published
NG110 MW
WAT BAT18 MW
BAT151 MW

By status, as published

StatusProjectsCapacity
(not published)28707 MW (from 27 of 28 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Solar
ID 1427
ISO-NE180not published7/21/202312/30/2029
Solar
ID 623
ISO-NE150not published10/31/201612/31/2022
Battery Storage
ID 1250
ISO-NE51not published4/14/202211/1/2024
Sanford Airport Solar
ID 583
ISO-NE50not published12/4/201511/7/2020
Solar
ID 803
ISO-NE50not published12/6/20187/1/2021
Sanford/Quaker Hill CMP Cluster 4
ID 1241
ISO-NE21not published3/28/20226/30/2028
Solar
ID 1573
ISO-NE20not published6/26/20246/6/2028
Mousam River Solar
ID 910
ISO-NE20not published8/27/201910/24/2025
GDC Saco Solar
ID 929
ISO-NE20not published10/15/201911/15/2027
Keay Brook Energy Solar
ID 786
ISO-NE20not published9/26/20189/25/2025
Saco Solar
ID 896
ISO-NE20not published7/17/20197/1/2026
Solar
ID 946
ISO-NE18not published12/27/20198/31/2021

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-09-072026-09-07 (changed this snapshot)source file

This week's changes · How this is collected

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.