Interconnection queue › Maine › York County
York County, Maine Interconnection Queue
Snapshot of 2026-09-07 · 28 projects · Maine (ME)
There are 28 projects in the interconnection queue located in York County, Maine (ME), totaling 707 MW across the 27 that publish a capacity.
Technology in York County
See what moved in York County, Maine each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in York County, Maine, from new entries to projects that came off the list.
Email me York County, Maine queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 28 | 707 MW |
By fuel, as published
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| SUN | 19 | 594 MW |
| SUN BAT | 3 | 42 MW |
| WAT | 2 | 2 MW |
| (not published) | 1 | not published |
| NG | 1 | 10 MW |
| WAT BAT | 1 | 8 MW |
| BAT | 1 | 51 MW |
By status, as published
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 28 | 707 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Solar | ISO-NE | 180 | not published | 7/21/2023 | 12/30/2029 |
| Solar | ISO-NE | 150 | not published | 10/31/2016 | 12/31/2022 |
| Battery Storage | ISO-NE | 51 | not published | 4/14/2022 | 11/1/2024 |
| Sanford Airport Solar | ISO-NE | 50 | not published | 12/4/2015 | 11/7/2020 |
| Solar | ISO-NE | 50 | not published | 12/6/2018 | 7/1/2021 |
| Sanford/Quaker Hill CMP Cluster 4 | ISO-NE | 21 | not published | 3/28/2022 | 6/30/2028 |
| Solar | ISO-NE | 20 | not published | 6/26/2024 | 6/6/2028 |
| Mousam River Solar | ISO-NE | 20 | not published | 8/27/2019 | 10/24/2025 |
| GDC Saco Solar | ISO-NE | 20 | not published | 10/15/2019 | 11/15/2027 |
| Keay Brook Energy Solar | ISO-NE | 20 | not published | 9/26/2018 | 9/25/2025 |
| Saco Solar | ISO-NE | 20 | not published | 7/17/2019 | 7/1/2026 |
| Solar | ISO-NE | 18 | not published | 12/27/2019 | 8/31/2021 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.