Interconnection queueMaineYork County › Solar

Solar Projects in York County, Maine

Snapshot of 2026-08-06 · 19 projects

19 solar projects are in the interconnection queue in York County, Maine, totalling 594 MW across the 19 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in York County, Maine

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in York County, Maine: what entered, what moved study phase, what came off the list.

Email me solar in York County, Maine queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE19594 MW

By fuel code, as published

FuelProjectsCapacity
SUN19594 MW

By status, as published

StatusProjects
(not published)19

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Solar
ID 1427
ISO-NE180not published7/21/202312/30/2029
Solar
ID 623
ISO-NE150not published10/31/201612/31/2022
Sanford Airport Solar
ID 583
ISO-NE50not published12/4/201511/7/2020
Solar
ID 803
ISO-NE50not published12/6/20187/1/2021
Solar
ID 1573
ISO-NE20not published6/26/20246/6/2028
Mousam River Solar
ID 910
ISO-NE20not published8/27/201910/24/2025
GDC Saco Solar
ID 929
ISO-NE20not published10/15/201911/15/2027
Keay Brook Energy Solar
ID 786
ISO-NE20not published9/26/20189/25/2025
Saco Solar
ID 896
ISO-NE20not published7/17/20197/1/2026
Solar
ID 946
ISO-NE18not published12/27/20198/31/2021
Emery Meadow Solar
ID 1021
ISO-NE16not published4/27/20209/30/2027
Solar
ID 1438
ISO-NE16not published10/10/202312/31/2024

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.