Interconnection queue › New York › Niagara County
Snapshot of 2026-08-06 · 27 projects · New York (NY)
There are 27 projects in the interconnection queue located in Niagara County, New York (NY), totalling 5,003 MW across the 24 that publish a capacity.
Get told what moves in Niagara County, New York
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Niagara County, New York: what entered, what moved study phase, what came off the list.
Email me Niagara County, New York queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| NYISO | 27 | 5,003 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| S | 8 | 840 MW |
| ES | 8 | 1,146 MW |
| W | 3 | 342 MW |
| AC | 3 | 150 MW |
| CT | 1 | 80 MW |
| CC | 1 | 752 MW |
| C | 1 | 687 MW |
| M | 1 | 6 MW |
| PS | 1 | 1,000 MW |
| Status | Projects | Capacity |
|---|---|---|
| Withdrawn | 22 | 4,268 MW |
| Cluster Study | 3 | 510 MW |
| Active | 2 | 225 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Riverbank Power A | NYISO | 1,000 | Withdrawn | 2008-02-20 | not published |
| Huntley | NYISO | 752 | Withdrawn | 2006-07-12 | not published |
| Somerset | NYISO | 687 | Withdrawn | 2006-11-01 | not published |
| Ridge View Solar Energy Center | NYISO | 350 | Withdrawn | 2019-05-28 | not published |
| Erie Canal BESS | NYISO | 230 | Withdrawn | 2023-07-31 | not published |
| Erie Canal BESS | NYISO | 230 | Cluster Study | 2024-10-15 | 02-2029 |
| Lighthouse Wind | NYISO | 201 | Withdrawn | 2014-06-30 | not published |
| BPP NY Somerset BESS I | NYISO | 200 | Withdrawn | 2023-09-22 | not published |
| Lockport Storage | NYISO | 186 | Withdrawn | 2022-08-29 | not published |
| Niagara Dolomite Solar | NYISO | 180 | Withdrawn | 2019-05-24 | not published |
| Lockport Storage | NYISO | 180 | Cluster Study | 2024-10-08 | 12-2028 |
| Fortran | NYISO | 150 | Withdrawn | 2006-03-14 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| NYISO | 2026-08-06 | 2026-07-16 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.