Snapshot of 2026-08-06 · 21 projects
21 storage projects are in the interconnection queue in Ulster County, New York, totalling 1,624 MW across the 21 that publish a capacity.
Get told what moves in storage in Ulster County, New York
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in storage in Ulster County, New York: what entered, what moved study phase, what came off the list.
Email me storage in Ulster County, New York queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| NYISO | 21 | 1,624 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| ES | 21 | 1,624 MW |
| Status | Projects |
|---|---|
| Withdrawn | 15 |
| Cluster Study | 5 |
| Active | 1 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Alcazar Energy Storage | NYISO | 250 | Withdrawn | 2023-07-17 | not published |
| NY New Paltz 540 State Rte 32 S Storage | NYISO | 217 | Withdrawn | 11/15/2022 | not published |
| Lincoln Park | NYISO | 150 | Withdrawn | 2023-12-27 | not published |
| Lincoln Park DG, LLC | NYISO | 150 | Cluster Study | 2024-08-01 | 12-2030 |
| Alcazar 2 | NYISO | 150 | Cluster Study | 2024-08-22 | 12-2028 |
| Highland Storage | NYISO | 115 | Withdrawn | 2022-11-23 | not published |
| Alcazar 1 | NYISO | 100 | Cluster Study | 2024-08-22 | 12-2028 |
| KCE NY 34 | NYISO | 100 | Cluster Study | 2024-09-17 | 12-2029 |
| Marlboro Storage | NYISO | 100 | Cluster Study | 2024-10-10 | 12-2028 |
| KCE NY 5 | NYISO | 94 | Active | 2019-12-27 | 12-2027 |
| Saugerties Energy Storage | NYISO | 50 | Withdrawn | 2024-01-09 | not published |
| Magruder BESS | NYISO | 20 | Withdrawn | 2018-07-18 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| NYISO | 2026-08-06 | 2026-07-16 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.