Snapshot of 2026-09-07 · 49 projects · Rhode Island (RI)
There are 49 projects in the interconnection queue located in Providence County, Rhode Island (RI), totaling 3,839 MW across the 44 that publish a capacity.
See what moved in Providence County, Rhode Island each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in Providence County, Rhode Island, from new entries to projects that came off the list.
Email me Providence County, Rhode Island queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 49 | 3,839 MW |
By fuel, as published
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| BAT | 13 | 1,622 MW |
| NG | 12 | 1,482 MW |
| SUN | 11 | 81 MW |
| DFO NG | 6 | 599 MW |
| LFG | 5 | 34 MW |
| (not published) | 1 | not published |
| WND | 1 | 21 MW |
By status, as published
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 49 | 3,839 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Clear River | ISO-NE | 1,030 | not published | 1/8/2015 | 5/31/2022 |
| Battery Storage | ISO-NE | 415 | not published | 6/7/2024 | 10/11/2027 |
| Combined Cycle( see # 201) | ISO-NE | 320 | not published | 8/1/2006 | 6/1/2012 |
| Battery Storage | ISO-NE | 305 | not published | 10/19/2022 | 12/30/2027 |
| Combustion Turbine Generator | ISO-NE | 238 | not published | 2/5/2015 | 5/31/2020 |
| Combustion Turbine | ISO-NE | 226 | not published | 2/23/2015 | 5/1/2019 |
| Battery Storage | ISO-NE | 170 | not published | 12/30/2021 | 12/31/2024 |
| Battery Storage | ISO-NE | 166 | not published | 5/31/2024 | 3/1/2028 |
| Battery Storage | ISO-NE | 109 | not published | 6/27/2023 | 4/1/2027 |
| Battery Storage | ISO-NE | 108 | not published | 12/12/2023 | 1/31/2027 |
| Battery Storage | ISO-NE | 108 | not published | 6/3/2024 | 1/31/2027 |
| Battery Storage | ISO-NE | 102 | not published | 5/5/2023 | 12/31/2026 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.