Interconnection queueRhode Island › Providence County

Providence County, Rhode Island Interconnection Queue

Snapshot of 2026-08-06 · 49 projects · Rhode Island (RI)

There are 49 projects in the interconnection queue located in Providence County, Rhode Island (RI), totalling 3,839 MW across the 44 that publish a capacity.

Get told what moves in Providence County, Rhode Island

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Providence County, Rhode Island: what entered, what moved study phase, what came off the list.

Email me Providence County, Rhode Island queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE493,839 MW (from 44 of 49 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
BAT131,622 MW
NG121,482 MW (from 11 of 12 projects)
SUN1181 MW
DFO NG6599 MW
LFG534 MW (from 2 of 5 projects)
(not published)1not published
WND121 MW

By status, as published

StatusProjectsCapacity
(not published)493,839 MW (from 44 of 49 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Clear River
ID 489
ISO-NE1,030not published1/8/20155/31/2022
Battery Storage
ID 1554
ISO-NE415not published6/7/202410/11/2027
Combined Cycle( see # 201)
ID 164
ISO-NE320not published8/1/20066/1/2012
Battery Storage
ID 1325
ISO-NE305not published10/19/202212/30/2027
Combustion Turbine Generator
ID 492
ISO-NE238not published2/5/20155/31/2020
Combustion Turbine
ID 523
ISO-NE226not published2/23/20155/1/2019
Battery Storage
ID 1209
ISO-NE170not published12/30/202112/31/2024
Battery Storage
ID 1548
ISO-NE166not published5/31/20243/1/2028
Battery Storage
ID 1418
ISO-NE109not published6/27/20234/1/2027
Battery Storage
ID 1472
ISO-NE108not published12/12/20231/31/2027
Battery Storage
ID 1549
ISO-NE108not published6/3/20241/31/2027
Battery Storage
ID 1396
ISO-NE102not published5/5/202312/31/2026

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.