Washington County, Rhode Island Interconnection Queue
Snapshot of 2026-09-07 · 31 projects · Rhode Island (RI)
There are 31 projects in the interconnection queue located in Washington County, Rhode Island (RI), totaling 1,900 MW across the 31 that publish a capacity.
Technology in Washington County
See what moved in Washington County, Rhode Island each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in Washington County, Rhode Island, from new entries to projects that came off the list.
Email me Washington County, Rhode Island queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 31 | 1,900 MW |
By fuel, as published
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| SUN | 23 | 204 MW |
| WND | 5 | 998 MW |
| BAT | 3 | 698 MW |
By status, as published
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 31 | 1,900 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Wind | ISO-NE | 536 | not published | 2/10/2010 | 12/31/2015 |
| Wind | ISO-NE | 385 | not published | 5/27/2008 | 12/1/2012 |
| Battery Storage | ISO-NE | 313 | not published | 6/12/2024 | 1/31/2027 |
| Battery Storage | ISO-NE | 205 | not published | 9/22/2021 | 12/7/2029 |
| Battery Storage | ISO-NE | 180 | not published | 4/1/2019 | 3/1/2023 |
| Wood River Substation - Western RI DER Study #3 | ISO-NE | 49 | not published | 8/19/2024 | 12/31/2026 |
| Wood River - NG WRI DG Area Study #2 >5 MW | ISO-NE | 34 | not published | 8/19/2020 | 6/30/2025 |
| Block Island Wind Farm | ISO-NE | 29 | not published | 1/18/2013 | 12/9/2016 |
| Wind | ISO-NE | 29 | not published | 8/28/2009 | 12/31/2012 |
| Wind | ISO-NE | 20 | not published | 2/5/2009 | 6/30/2012 |
| Alton Solar | ISO-NE | 14 | not published | 11/20/2017 | 4/30/2020 |
| Wood River - NG WRI DG Area Study #2 <5 MW | ISO-NE | 10 | not published | 8/19/2020 | 6/30/2025 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.