Interconnection queue › Oklahoma › Hybrid

Hybrid Projects in the Oklahoma Interconnection Queue

Snapshot of 2026-09-07 · 21 projects

21 hybrid projects are in the interconnection queue with a Oklahoma location, totaling 3,635 MW across the 21 that publish a capacity.

Grouped from the ISOs' own fuel codes (see the mapping). Codes we could not match to a published definition are left unclassified rather than assigned here.

See what moved in hybrid in Oklahoma each week

The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in hybrid in Oklahoma, from new entries to projects that came off the list.

Email me hybrid in Oklahoma queue changes

Work email only. No newsletter, no obligation.

By ISO

ISOProjectsCapacity
SPP213,635 MW

By status, as published

StatusProjects
DISIS STAGE8
IA FULLY EXECUTED/ON SCHEDULE6
IA PENDING5
IA FULLY EXECUTED/ON SUSPENSION1
None1

Top counties

CountyProjectsCapacity
Choctaw2225 MW
Woods2575 MW
McCurtain2357 MW
Grady1120 MW
Lincoln180 MW
Konawa1160 MW
Mayes1500 MW
Murray1160 MW
Washington1150 MW
Sequoyah1170 MW
Atoka1100 MW
LeFlore1200 MW
Rogers1135 MW
Caddo1100 MW
Headrick1113 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
GEN-2024-294
ID GEN-2024-294
SPPMayes500DISIS STAGE3/1/202512/31/2030
GEN-2023-102
ID GEN-2023-102
SPPWoods475IA FULLY EXECUTED/ON SCHEDULE10/2/20233/1/2029
GEN-2018-115
ID GEN-2018-115
SPPLawton250IA FULLY EXECUTED/ON SCHEDULE11/21/20183/9/2029
GEN-2020-020
ID GEN-2020-020
SPPMcCurtain202IA FULLY EXECUTED/ON SCHEDULE4/28/202011/15/2027
GEN-2023-064
ID GEN-2023-064
SPPLeFlore200IA PENDING10/2/202312/1/2029
GEN-2024-113
ID GEN-2024-113
SPPSequoyah170DISIS STAGE3/1/202512/31/2028
GEN-2024-219
ID GEN-2024-219
SPPMurray160DISIS STAGE3/1/20256/28/2030
GEN-2024-360
ID GEN-2024-360
SPPKonawa160DISIS STAGE3/1/20256/30/2029
GEN-2021-063
ID GEN-2021-063
SPPMcCurtain155IA FULLY EXECUTED/ON SCHEDULE4/28/202112/31/2027
GEN-2024-117
ID GEN-2024-117
SPPWashington150DISIS STAGE3/1/202512/31/2028
GEN-2020-010
ID GEN-2020-010
SPPMutual140IA FULLY EXECUTED/ON SUSPENSION4/8/202012/30/2029
GEN-2023-063
ID GEN-2023-063
SPPRogers135IA PENDING10/2/202312/1/2028

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: SPP last changed 2026-09-05 (3 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
SPP2026-09-072026-09-05 (unchanged across 3 weekly reads)source file

This week's changes · How this is collected

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.