Interconnection queueArizona › Maricopa County

Maricopa County, Arizona Interconnection Queue

Snapshot of 2026-08-06 · 37 projects · Arizona (AZ)

There are 37 projects in the interconnection queue located in Maricopa County, Arizona (AZ), totalling 13,154 MW across the 37 that publish a capacity.

Technology in Maricopa County

Get told what moves in Maricopa County, Arizona

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Maricopa County, Arizona: what entered, what moved study phase, what came off the list.

Email me Maricopa County, Arizona queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO3713,154 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Solar257,552 MW
Battery115,302 MW
Natural Gas1300 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN2511,162 MW
COMPLETED7872 MW
ACTIVE51,120 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
ARIZONA A1
ID 1752
CAISO2,000WITHDRAWN2020-04-15not published
AZ BIGHORN
ID 389
CAISO900WITHDRAWN2008-05-29not published
HYDER
ID 2172
CAISO800WITHDRAWN2021-04-15not published
CVH POWER II
ID 808
CAISO700WITHDRAWN2011-03-31not published
HARQUAHALA SOLAR
ID 1298
CAISO515WITHDRAWN2016-05-02not published
PITCHFORK ENERGY
ID 1530
CAISO500WITHDRAWN2018-04-16not published
LA PAZ
ID 1753
CAISO500WITHDRAWN2020-04-15not published
LA PAZ 2
ID 2021
CAISO500WITHDRAWN2021-04-15not published
HARQUAHALA FLATS
ID 1403
CAISO450WITHDRAWN2017-05-01not published
SUN STREAMS 5
ID 1823
CAISO450WITHDRAWN2020-04-15not published
PRIMROSE HYBRID
ID 2028
CAISO450WITHDRAWN2021-04-15not published
HARQUAHALA FLATS 2
ID 2027
CAISO400ACTIVE2021-04-15not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.