Interconnection queue › Arizona

Arizona Interconnection Queue

Snapshot of 2026-07-30 · 72 projects · CAISO

There are 72 projects in the interconnection queue with a Arizona location, totalling 32,962 MW across the 72 that publish a capacity.

Technology in Arizona

Get told what moves in Arizona

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Arizona: what entered, what moved study phase, what came off the list.

Email me Arizona queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO7232,962 MW

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
Solar5421,760 MW
Battery1610,352 MW
Natural Gas2850 MW

Top counties

CountyProjectsCapacity
MARICOPA3713,154 MW
YUMA197,295 MW
LA PAZ1110,000 MW
MOHAVE21,065 MW
LA PAZ/MARICOPA1900 MW
MOJAVE1310 MW
HYDER1238 MW

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.