Interconnection queueCalifornia › Alameda County

Alameda County, California Interconnection Queue

Snapshot of 2026-08-06 · 53 projects · California (CA)

There are 53 projects in the interconnection queue located in Alameda County, California (CA), totalling 8,513 MW across the 53 that publish a capacity.

Technology in Alameda County

Get told what moves in Alameda County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Alameda County, California: what entered, what moved study phase, what came off the list.

Email me Alameda County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO538,513 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Battery274,629 MW
Wind Turbine9753 MW
Natural Gas92,328 MW
Solar7448 MW
(not published)1354 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN385,921 MW
ACTIVE91,336 MW
COMPLETED61,256 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
CPV CALIFORNIA VI
ID 228
CAISO630WITHDRAWN2007-06-20not published
EAST ALTAMONT ENERGY CENTER
ID 377
CAISO600WITHDRAWN2008-05-28not published
MOONSTONE ENERGY STORAGE
ID 1879
CAISO500WITHDRAWN2021-04-15not published
SPECTRUM ENERGY STORAGE
ID 1881
CAISO500ACTIVE2021-04-15not published
KOLA
ID 1275
CAISO400COMPLETED2016-05-02not published
RUSSELL CITY ENERGY CENTER
ID 45
CAISO354COMPLETED2004-12-01not published
WARDENCLYFFE
ID 1366
CAISO300WITHDRAWN2017-05-01not published
MAVERICKS
ID 1502
CAISO300WITHDRAWN2018-04-16not published
LSP OAKLAND
ID 155
CAISO300WITHDRAWN2006-12-01not published
CHIA ESS
ID 1685
CAISO300WITHDRAWN2020-04-15not published
ESPRESSO
ID 1912
CAISO300ACTIVE2021-04-15not published
LONE TREE WIND
ID 721
CAISO299WITHDRAWN2011-03-31not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.