Interconnection queue › California › Alameda County
Snapshot of 2026-08-06 · 53 projects · California (CA)
There are 53 projects in the interconnection queue located in Alameda County, California (CA), totalling 8,513 MW across the 53 that publish a capacity.
Get told what moves in Alameda County, California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Alameda County, California: what entered, what moved study phase, what came off the list.
Email me Alameda County, California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 53 | 8,513 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| Battery | 27 | 4,629 MW |
| Wind Turbine | 9 | 753 MW |
| Natural Gas | 9 | 2,328 MW |
| Solar | 7 | 448 MW |
| (not published) | 1 | 354 MW |
| Status | Projects | Capacity |
|---|---|---|
| WITHDRAWN | 38 | 5,921 MW |
| ACTIVE | 9 | 1,336 MW |
| COMPLETED | 6 | 1,256 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| CPV CALIFORNIA VI | CAISO | 630 | WITHDRAWN | 2007-06-20 | not published |
| EAST ALTAMONT ENERGY CENTER | CAISO | 600 | WITHDRAWN | 2008-05-28 | not published |
| MOONSTONE ENERGY STORAGE | CAISO | 500 | WITHDRAWN | 2021-04-15 | not published |
| SPECTRUM ENERGY STORAGE | CAISO | 500 | ACTIVE | 2021-04-15 | not published |
| KOLA | CAISO | 400 | COMPLETED | 2016-05-02 | not published |
| RUSSELL CITY ENERGY CENTER | CAISO | 354 | COMPLETED | 2004-12-01 | not published |
| WARDENCLYFFE | CAISO | 300 | WITHDRAWN | 2017-05-01 | not published |
| MAVERICKS | CAISO | 300 | WITHDRAWN | 2018-04-16 | not published |
| LSP OAKLAND | CAISO | 300 | WITHDRAWN | 2006-12-01 | not published |
| CHIA ESS | CAISO | 300 | WITHDRAWN | 2020-04-15 | not published |
| ESPRESSO | CAISO | 300 | ACTIVE | 2021-04-15 | not published |
| LONE TREE WIND | CAISO | 299 | WITHDRAWN | 2011-03-31 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.