Interconnection queueCalifornia › Fresno County

Fresno County, California Interconnection Queue

Snapshot of 2026-08-06 · 208 projects · California (CA)

There are 208 projects in the interconnection queue located in Fresno County, California (CA), totalling 26,568 MW across the 208 that publish a capacity.

Technology in Fresno County

Get told what moves in Fresno County, California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Fresno County, California: what entered, what moved study phase, what came off the list.

Email me Fresno County, California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO20826,568 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Solar14613,057 MW
Battery4010,305 MW
Natural Gas162,894 MW
Biofuel2112 MW
Flywheel251 MW
(not published)11 MW
Wind Turbine1150 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN16720,106 MW
ACTIVE264,883 MW
COMPLETED151,579 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
EDGEWOOD SOLAR HYBRID
ID 1715
CAISO1,700WITHDRAWN2020-04-15not published
PINEBROOK SOLAR HYBRID ENERGY CENTER
ID 1581
CAISO1,500WITHDRAWN2019-04-15not published
DARDEN
ID 1949
CAISO1,150ACTIVE2021-04-15not published
HEARTLAND SOLAR
ID 1231
CAISO1,043WITHDRAWN2016-05-02not published
HEARTLAND SOLAR-2
ID 1232
CAISO1,042WITHDRAWN2016-05-02not published
ATLAS
ID 1468
CAISO1,000WITHDRAWN2018-04-16not published
KRCD COMMUNITY POWER PLANT
ID 128
CAISO600WITHDRAWN2006-09-01not published
LOCK STORAGE
ID 1962
CAISO500ACTIVE2021-04-15not published
MERCATOR
ID 1482
CAISO500WITHDRAWN2018-04-16not published
PANOCHE ENERGY CENTER C11
ID 1484
CAISO427COMPLETED2018-04-16not published
PANOCHE ENERGY CENTER
ID 52
CAISO401COMPLETED2004-12-21not published
SCARLET
ID 1135
CAISO400ACTIVE2015-04-30not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.