Interconnection queueMassachusetts › Franklin County

Franklin County, Massachusetts Interconnection Queue

Snapshot of 2026-08-06 · 29 projects · Massachusetts (MA)

There are 29 projects in the interconnection queue located in Franklin County, Massachusetts (MA), totalling 1,231 MW across the 28 that publish a capacity.

Get told what moves in Franklin County, Massachusetts

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Franklin County, Massachusetts: what entered, what moved study phase, what came off the list.

Email me Franklin County, Massachusetts queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE291,231 MW (from 28 of 29 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
BAT10913 MW
WAT8100 MW (from 7 of 8 projects)
SUN BAT6145 MW
SUN217 MW
WDS150 MW
WND10 MW
WAT BAT17 MW

By status, as published

StatusProjectsCapacity
(not published)291,231 MW (from 28 of 29 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Battery Storage
ID 1517
ISO-NE366not published4/9/20248/30/2028
Battery Storage
ID 1434
ISO-NE160not published8/15/202312/31/2027
Battery Storage
ID 1112
ISO-NE105not published3/24/202112/30/2029
Battery Storage
ID 1545
ISO-NE101not published5/30/20248/1/2028
Battery Storage + Solar
ID 1512
ISO-NE100not published4/8/202412/31/2027
Battery Storage
ID 1170
ISO-NE100not published10/22/20211/11/2023
Battery Storage
ID 1106
ISO-NE55not published3/15/20215/15/2025
Biomass Project
ID 282
ISO-NE50not published10/15/20082/1/2014
Wendall Depot Substation - NG WMA Group 3
ID 1189
ISO-NE28not published10/27/202112/31/2027
Northfield Mt Upgrade #3
ID 196
ISO-NE25not published1/16/20076/17/2011
Northfield Mt Upgrade #1
ID 196#84135cdb
ISO-NE25not published1/16/20072/18/2016
Northfield Mt. Upgrade #2
ID 196#e6d2c4b8
ISO-NE25not published1/16/20075/25/2012

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.