Interconnection queue › Massachusetts
Snapshot of 2026-07-30 · 605 projects · ISO-NE
There are 605 projects in the interconnection queue with a Massachusetts location, totalling 81,350 MW across the 528 that publish a capacity.
Get told what moves in Massachusetts
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Massachusetts: what entered, what moved study phase, what came off the list.
Email me Massachusetts queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 605 | 81,350 MW |
Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.
| Fuel | Projects | Capacity |
|---|---|---|
| BAT | 163 | 23,745 MW |
| SUN BAT | 106 | 1,125 MW |
| SUN | 65 | 697 MW |
| DFO NG | 48 | 7,267 MW |
| WND | 47 | 20,595 MW |
| N/A | 47 | 20,860 MW |
| NG | 36 | 4,942 MW |
| (not published) | 30 | not published |
| WAT | 24 | 258 MW |
| BIT | 9 | 36 MW |
| WDS | 7 | 253 MW |
| DFO | 4 | 10 MW |
| LFG | 4 | 3 MW |
| NUC | 2 | 0 MW |
| NG WO | 2 | 379 MW |
| County | Projects | Capacity |
|---|---|---|
| Worcester | 104 | 6,210 MW |
| Hampden | 68 | 6,307 MW |
| Bristol | 65 | 7,799 MW |
| Middlesex | 59 | 10,551 MW |
| Plymouth | 50 | 7,056 MW |
| Berkshire | 42 | 2,767 MW |
| Norfolk | 38 | 3,645 MW |
| NA | 34 | 20,926 MW |
| Barnstable | 33 | 2,445 MW |
| Franklin | 29 | 1,231 MW |
| Suffolk | 23 | 5,154 MW |
| Essex | 19 | 2,420 MW |
| Hampshire | 16 | 532 MW |
| N/A | 8 | 454 MW |
| (not published) | 3 | 3,600 MW |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-07-30 | 2026-07-30 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.