Interconnection queueMassachusetts › Middlesex County

Middlesex County, Massachusetts Interconnection Queue

Snapshot of 2026-08-06 · 59 projects · Massachusetts (MA)

There are 59 projects in the interconnection queue located in Middlesex County, Massachusetts (MA), totalling 10,551 MW across the 48 that publish a capacity.

Technology in Middlesex County

Get told what moves in Middlesex County, Massachusetts

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Middlesex County, Massachusetts: what entered, what moved study phase, what came off the list.

Email me Middlesex County, Massachusetts queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE5910,551 MW (from 48 of 59 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
BAT172,925 MW
DFO NG11481 MW (from 9 of 11 projects)
N/A116,618 MW (from 8 of 11 projects)
(not published)6not published
SUN BAT636 MW
NG4154 MW
NG SUN BAT28 MW
NG WO1311 MW
JF118 MW

By status, as published

StatusProjectsCapacity
(not published)5910,551 MW (from 48 of 59 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
1200 MW controllable ETU - unidirectional
ID 1411
ISO-NE1,200not published6/20/20235/31/2032
AC to HVDC Tie
ID 512
ISO-NE1,200not published2/16/20153/31/2019
1200 MW HVDC Line (controllable) Into Mystic
ID 873
ISO-NE1,200not published4/4/20198/1/2024
HVDC Line
ID 509
ISO-NE1,100not published2/16/20156/30/2017
HVDC from S. Maine to Mystic - bidirectional flow
ID 517
ISO-NE1,000not published2/16/201512/31/2018
HVDC Tie NB to Mystic
ID 585
ISO-NE900not published12/14/201512/30/2020
Battery Storage
ID 1143
ISO-NE508not published6/15/20215/31/2028
Battery Storage
ID 1057
ISO-NE500not published8/28/20206/1/2025
Battery Storage
ID 1567
ISO-NE500not published6/11/20244/27/2028
Billerica Power
ID 157
ISO-NE311not published6/21/20066/15/2011
Gas Turbine
ID 408
ISO-NE208not published2/28/20135/31/2018
Battery Storage
ID 1082
ISO-NE204not published10/29/20206/1/2025

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.