Interconnection queue › Massachusetts › Worcester County
Snapshot of 2026-08-06 · 104 projects · Massachusetts (MA)
There are 104 projects in the interconnection queue located in Worcester County, Massachusetts (MA), totalling 6,210 MW across the 100 that publish a capacity.
Get told what moves in Worcester County, Massachusetts
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Worcester County, Massachusetts: what entered, what moved study phase, what came off the list.
Email me Worcester County, Massachusetts queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 104 | 6,210 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| BAT | 36 | 3,680 MW |
| SUN | 34 | 400 MW |
| SUN BAT | 14 | 192 MW |
| NG | 10 | 683 MW |
| DFO NG | 3 | 1,210 MW |
| WND | 3 | 42 MW |
| LFG | 3 | 3 MW |
| WDS | 1 | 0 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 104 | 6,210 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Combined Cycle | ISO-NE | 1,020 | not published | 11/30/2015 | 5/31/2020 |
| Battery Storage | ISO-NE | 408 | not published | 4/8/2024 | 8/30/2028 |
| Battery Storage | ISO-NE | 300 | not published | 4/26/2023 | 12/31/2026 |
| Battery Storage | ISO-NE | 300 | not published | 4/8/2024 | 8/30/2028 |
| Battery Storage | ISO-NE | 262 | not published | 6/20/2023 | 8/12/2024 |
| Battery Storage | ISO-NE | 205 | not published | 6/6/2024 | 10/11/2027 |
| Battery Storage | ISO-NE | 204 | not published | 10/7/2022 | 2/23/2027 |
| Battery Storage | ISO-NE | 200 | not published | 4/26/2023 | 12/31/2026 |
| Battery Storage | ISO-NE | 190 | not published | 12/12/2023 | 1/31/2027 |
| Gas Turbine | ISO-NE | 190 | not published | 10/23/2006 | 6/1/2011 |
| Gas Turbine | ISO-NE | 188 | not published | 12/5/2008 | 6/1/2012 |
| Battery Storage | ISO-NE | 180 | not published | 5/31/2024 | 4/27/2028 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.