Interconnection queue › New Hampshire › Grafton County
Snapshot of 2026-08-06 · 27 projects · New Hampshire (NH)
There are 27 projects in the interconnection queue located in Grafton County, New Hampshire (NH), totalling 3,187 MW across the 27 that publish a capacity.
Get told what moves in Grafton County, New Hampshire
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Grafton County, New Hampshire: what entered, what moved study phase, what came off the list.
Email me Grafton County, New Hampshire queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 27 | 3,187 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| SUN | 12 | 497 MW |
| WAT | 5 | 13 MW |
| WND | 5 | 151 MW |
| WDS | 2 | 26 MW |
| N/A | 2 | 2,400 MW |
| BAT | 1 | 100 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 27 | 3,187 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| 1200 MW (+/- 400 kV) HVDC External ETU | ISO-NE | 1,200 | not published | 4/11/2023 | 7/1/2029 |
| 400 kV HVDC Tie - Import Only | ISO-NE | 1,200 | not published | 12/27/2016 | 12/31/2022 |
| Solar | ISO-NE | 150 | not published | 3/31/2022 | 11/1/2025 |
| Energy Storage | ISO-NE | 100 | not published | 3/28/2019 | 5/31/2023 |
| Solar | ISO-NE | 60 | not published | 7/26/2019 | 6/1/2022 |
| Solar | ISO-NE | 54 | not published | 10/24/2022 | 6/5/2024 |
| Solar | ISO-NE | 51 | not published | 1/10/2020 | 6/1/2022 |
| Spruce Ridge Wind Farm | ISO-NE | 51 | not published | 1/30/2012 | 10/31/2017 |
| Wind | ISO-NE | 50 | not published | 3/31/2008 | 12/31/2010 |
| Groton Wind Farm | ISO-NE | 48 | not published | 9/8/2010 | 12/28/2012 |
| Solar | ISO-NE | 33 | not published | 7/26/2019 | 6/1/2022 |
| Solar | ISO-NE | 27 | not published | 12/7/2020 | 6/1/2022 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.