Snapshot of 2026-08-06 · 27 projects · New Hampshire (NH)

There are 27 projects in the interconnection queue located in Grafton County, New Hampshire (NH), totalling 3,187 MW across the 27 that publish a capacity.

Get told what moves in Grafton County, New Hampshire

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Grafton County, New Hampshire: what entered, what moved study phase, what came off the list.

Email me Grafton County, New Hampshire queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE273,187 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
SUN12497 MW
WAT513 MW
WND5151 MW
WDS226 MW
N/A22,400 MW
BAT1100 MW

By status, as published

StatusProjectsCapacity
(not published)273,187 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
1200 MW (+/- 400 kV) HVDC External ETU
ID 1381
ISO-NE1,200not published4/11/20237/1/2029
400 kV HVDC Tie - Import Only
ID 627
ISO-NE1,200not published12/27/201612/31/2022
Solar
ID 1246
ISO-NE150not published3/31/202211/1/2025
Energy Storage
ID 871
ISO-NE100not published3/28/20195/31/2023
Solar
ID 897
ISO-NE60not published7/26/20196/1/2022
Solar
ID 1329
ISO-NE54not published10/24/20226/5/2024
Solar
ID 948
ISO-NE51not published1/10/20206/1/2022
Spruce Ridge Wind Farm
ID 390
ISO-NE51not published1/30/201210/31/2017
Wind
ID 255
ISO-NE50not published3/31/200812/31/2010
Groton Wind Farm
ID 345
ISO-NE48not published9/8/201012/28/2012
Solar
ID 898
ISO-NE33not published7/26/20196/1/2022
Solar
ID 1088
ISO-NE27not published12/7/20206/1/2022

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.