Interconnection queue › Nevada › Clark County › Solar
Snapshot of 2026-08-06 · 29 projects
29 solar projects are in the interconnection queue in Clark County, Nevada, totalling 6,516 MW across the 29 that publish a capacity.
Get told what moves in solar in Clark County, Nevada
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Clark County, Nevada: what entered, what moved study phase, what came off the list.
Email me solar in Clark County, Nevada queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 29 | 6,516 MW |
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 29 | 6,516 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 21 |
| COMPLETED | 5 |
| ACTIVE | 3 |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| NEVADA MOHAVE SOLAR | CAISO | 400 | WITHDRAWN | 2015-04-30 | not published |
| BULLHEAD SOLAR | CAISO | 400 | WITHDRAWN | 2019-04-15 | not published |
| JEAN LAKE SOLAR | CAISO | 400 | WITHDRAWN | 2007-06-27 | not published |
| SOUTHLAND | CAISO | 375 | WITHDRAWN | 2016-05-02 | not published |
| KAWICH | CAISO | 350 | ACTIVE | 2021-04-15 | not published |
| LARREA SOLAR | CAISO | 300 | ACTIVE | 2021-04-15 | not published |
| NEVADA 300 | CAISO | 300 | WITHDRAWN | 2010-07-31 | not published |
| BOULDER SOLAR POWER | CAISO | 300 | WITHDRAWN | 2012-04-02 | not published |
| ENN MOJAVE POWER 3 | CAISO | 300 | WITHDRAWN | 2012-04-02 | not published |
| SANDY VALLEY PHASE I SEGS (FKA PAHRUMP VALLEY SEGS) | CAISO | 270 | WITHDRAWN | 2011-03-31 | not published |
| COPPER MTN SOLAR 5 | CAISO | 257 | WITHDRAWN | 2016-05-02 | not published |
| BOULDER SOLAR 3 (FKA: BOULDER SOLAR POWER C7) | CAISO | 250 | WITHDRAWN | 2014-04-30 | not published |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.