Interconnection queueNevadaClark County › Solar

Solar Projects in Clark County, Nevada

Snapshot of 2026-08-06 · 29 projects

29 solar projects are in the interconnection queue in Clark County, Nevada, totalling 6,516 MW across the 29 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Clark County, Nevada

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Clark County, Nevada: what entered, what moved study phase, what came off the list.

Email me solar in Clark County, Nevada queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO296,516 MW

By fuel code, as published

FuelProjectsCapacity
Solar296,516 MW

By status, as published

StatusProjects
WITHDRAWN21
COMPLETED5
ACTIVE3

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
NEVADA MOHAVE SOLAR
ID 1218
CAISO400WITHDRAWN2015-04-30not published
BULLHEAD SOLAR
ID 1648
CAISO400WITHDRAWN2019-04-15not published
JEAN LAKE SOLAR
ID 234
CAISO400WITHDRAWN2007-06-27not published
SOUTHLAND
ID 1336
CAISO375WITHDRAWN2016-05-02not published
KAWICH
ID 2147
CAISO350ACTIVE2021-04-15not published
LARREA SOLAR
ID 2150
CAISO300ACTIVE2021-04-15not published
NEVADA 300
ID 643AI
CAISO300WITHDRAWN2010-07-31not published
BOULDER SOLAR POWER
ID 887
CAISO300WITHDRAWN2012-04-02not published
ENN MOJAVE POWER 3
ID 931
CAISO300WITHDRAWN2012-04-02not published
SANDY VALLEY PHASE I SEGS (FKA PAHRUMP VALLEY SEGS)
ID 740
CAISO270WITHDRAWN2011-03-31not published
COPPER MTN SOLAR 5
ID 1338
CAISO257WITHDRAWN2016-05-02not published
BOULDER SOLAR 3 (FKA: BOULDER SOLAR POWER C7)
ID 1069
CAISO250WITHDRAWN2014-04-30not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.