Interconnection queueNew York › Clinton County

Clinton County, New York Interconnection Queue

Snapshot of 2026-08-06 · 26 projects · New York (NY)

There are 26 projects in the interconnection queue located in Clinton County, New York (NY), totalling 3,822 MW across the 24 that publish a capacity.

Two grid operators cover this county. The tables below keep them apart. Each ISO runs its own queue with its own status vocabulary and its own study process, and adding the two together would produce a number that describes no real queue.

Get told what moves in Clinton County, New York

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Clinton County, New York: what entered, what moved study phase, what came off the list.

Email me Clinton County, New York queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
NYISO243,772 MW (from 23 of 24 projects)
ISO-NE250 MW (from 1 of 2 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
ES7875 MW
W5903 MW
S5205 MW
AC31,200 MW (from 2 of 3 projects)
(not published)2150 MW (from 1 of 2 projects)
CR240 MW
BAT150 MW
DC1400 MW

By status, as published

StatusProjectsCapacity
Withdrawn223,547 MW (from 21 of 22 projects)
(not published)250 MW (from 1 of 2 projects)
Cluster Study2225 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Champlain Wind Link I
ID 0343
NYISO600Withdrawn2009-09-29not published
Champlain Wind Link II
ID 0344
NYISO600Withdrawn2009-09-29not published
Bull Run II Wind
ID 0521
NYISO449Withdrawn2015-12-15not published
Grand Isle Intertie
ID 0386
NYISO400Withdrawn2012-06-28not published
Bull Run Wind
ID 0497
NYISO304Withdrawn2015-04-24not published
Northline Energy Center
ID 1181
NYISO200Withdrawn2021-05-20not published
Marble River Storage
ID 1625
NYISO160Withdrawn2023-10-25not published
Orion Energy NY III
ID 0159
NYISO150Withdrawn2004-10-12not published
Valcour Storage
ID 1660
NYISO150Withdrawn2023-12-28not published
Valcour Storage
ID C24-139
NYISO150Cluster Study2024-09-0912-2028
Bull Run Solar Energy Center
ID 0686
NYISO125Withdrawn2018-01-26not published
Lake City Storage
ID 1624
NYISO120Withdrawn2023-10-25not published

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (4 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file
NYISO2026-08-062026-07-16 (unchanged across 4 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.