Interconnection queueNew York › Madison County

Madison County, New York Interconnection Queue

Snapshot of 2026-08-06 · 27 projects · New York (NY)

There are 27 projects in the interconnection queue located in Madison County, New York (NY), totalling 1,164 MW across the 27 that publish a capacity.

Technology in Madison County

Get told what moves in Madison County, New York

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Madison County, New York: what entered, what moved study phase, what came off the list.

Email me Madison County, New York queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
NYISO271,164 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
W15630 MW
S5220 MW
CR4288 MW
M12 MW
CT14 MW
ES120 MW

By status, as published

StatusProjectsCapacity
Withdrawn24922 MW
Active2212 MW
Cluster Study130 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Ditch Creek Solar
ID 1361
NYISO200Withdrawn2022-04-12not published
Oxbow Hill Solar
ID 0805
NYISO140Active2019-03-2201-2027
Hoffman Falls Wind 2
ID 1335
NYISO102Withdrawn2022-02-24not published
Rolling Upland Wind Farm LLC
ID 1549
NYISO80Withdrawn2023-04-25not published
Stockbridge Wind
ID 0449
NYISO73Withdrawn2014-08-13not published
Rolling Upland Wind
ID 0520
NYISO73Withdrawn2015-12-03not published
Hoffman Falls Wind
ID 1130
NYISO72Active2021-01-2704-2029
Rolling Upland Wind
ID 0322
NYISO60Withdrawn2009-01-13not published
New Boston Solar LLC
ID 1217
NYISO50Withdrawn7/9/2021not published
West Hill Windfarm
ID 0147
NYISO32Withdrawn2004-04-16not published
Hoffman Falls Wind 2
ID C24-042
NYISO30Cluster Study2024-08-0112-2027
Blue Hill Wind
ID 1116
NYISO25Withdrawn2020-11-24not published

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (4 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
NYISO2026-08-062026-07-16 (unchanged across 4 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.