Interconnection queue › California › Gas
Snapshot of 2026-07-30 · 235 projects
235 gas projects are in the interconnection queue with a California location, totalling 68,693 MW across the 235 that publish a capacity.
Get told what moves in gas in California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in gas in California: what entered, what moved study phase, what came off the list.
Email me gas in California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 235 | 68,693 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 193 |
| COMPLETED | 36 |
| ACTIVE | 6 |
| County | Projects | Capacity |
|---|---|---|
| SAN DIEGO | 55 | 10,971 MW |
| KERN | 24 | 5,098 MW |
| LOS ANGELES | 20 | 9,263 MW |
| SAN JOAQUIN | 19 | 5,392 MW |
| FRESNO | 16 | 2,894 MW |
| CONTRA COSTA | 15 | 5,668 MW |
| SAN BERNARDINO | 13 | 5,595 MW |
| ORANGE | 11 | 4,123 MW |
| ALAMEDA | 9 | 2,328 MW |
| RIVERSIDE | 8 | 4,369 MW |
| KINGS | 6 | 1,492 MW |
| SOLANO | 5 | 2,716 MW |
| SUTTER | 4 | 1,870 MW |
| SAN FRANCISCO | 3 | 244 MW |
| MADERA | 3 | 404 MW |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-07-30 | 2026-07-30 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.