Interconnection queue › California › Hydro
Snapshot of 2026-07-30 · 15 projects
15 hydro projects are in the interconnection queue with a California location, totalling 6,433 MW across the 15 that publish a capacity.
Get told what moves in hydro in California
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in hydro in California: what entered, what moved study phase, what came off the list.
Email me hydro in California queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 15 | 6,433 MW |
| Status | Projects |
|---|---|
| WITHDRAWN | 11 |
| ACTIVE | 2 |
| COMPLETED | 2 |
| County | Projects | Capacity |
|---|---|---|
| RIVERSIDE | 4 | 5,508 MW |
| TEHAMA | 3 | 6 MW |
| PLACER | 2 | 31 MW |
| SAN DIEGO | 1 | 40 MW |
| TUOLUMNE | 1 | 7 MW |
| HUMBOLDT | 1 | 40 MW |
| MENDOCINO | 1 | 40 MW |
| SAN LUIS OBISPO | 1 | 650 MW |
| MARIPOSA | 1 | 110 MW |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-07-30 | 2026-07-30 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.