Interconnection queue › California › Hydro
Hydro Projects in the California Interconnection Queue
Snapshot of 2026-09-07 · 15 projects
15 hydro projects are in the interconnection queue with a California location, totaling 6,433 MW across the 15 that publish a capacity.
See what moved in hydro in California each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in hydro in California, from new entries to projects that came off the list.
Email me hydro in California queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 15 | 6,433 MW |
By status, as published
| Status | Projects |
|---|---|
| WITHDRAWN | 11 |
| ACTIVE | 2 |
| COMPLETED | 2 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| RIVERSIDE | 4 | 5,508 MW |
| TEHAMA | 3 | 6 MW |
| PLACER | 2 | 31 MW |
| SAN DIEGO | 1 | 40 MW |
| TUOLUMNE | 1 | 7 MW |
| HUMBOLDT | 1 | 40 MW |
| MENDOCINO | 1 | 40 MW |
| SAN LUIS OBISPO | 1 | 650 MW |
| MARIPOSA | 1 | 110 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| EAGLE MOUNTAIN PUMP STORAGE #4 | CAISO | RIVERSIDE | 1,408 | WITHDRAWN | 2015-04-30 | not published |
| EAGLE MOUNTAIN PUMP STORAGE #2 | CAISO | RIVERSIDE | 1,400 | WITHDRAWN | 2010-02-01 | not published |
| EAGLE MOUNTAIN PUMP STORAGE #3 | CAISO | RIVERSIDE | 1,400 | WITHDRAWN | 2011-03-31 | not published |
| EAGLE MOUNTAIN PUMPED STORAGE PROJECT | CAISO | RIVERSIDE | 1,300 | WITHDRAWN | 2008-05-16 | not published |
| MORRO BAY WAVE ENERGY PROJECT | CAISO | SAN LUIS OBISPO | 650 | WITHDRAWN | 2015-04-30 | not published |
| EXCHEQUER | CAISO | MARIPOSA | 110 | WITHDRAWN | 2017-05-01 | not published |
| LAKE HODGES PUMPED STORAGE PROJECT | CAISO | SAN DIEGO | 40 | COMPLETED | 2003-01-03 | not published |
| HUMBOLDT WAVECONNECT PROJECT | CAISO | HUMBOLDT | 40 | WITHDRAWN | 2007-11-30 | not published |
| MENDOCINO WAVECONNECT PROJECT | CAISO | MENDOCINO | 40 | WITHDRAWN | 2007-11-30 | not published |
| LAKE CLEMENTINE HYDROELECTRIC C7 | CAISO | PLACER | 16 | WITHDRAWN | 2014-04-30 | not published |
| LAKE CLEMENTINE HYDROELECTRIC | CAISO | PLACER | 16 | WITHDRAWN | 2013-04-30 | not published |
| TULLOCH POWERHOUSE | CAISO | TUOLUMNE | 7 | COMPLETED | 2009-07-31 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.