Interconnection queue › California › Solar
Solar Projects in the California Interconnection Queue
Snapshot of 2026-09-07 · 942 projects
942 solar projects are in the interconnection queue with a California location, totaling 140,018 MW across the 942 that publish a capacity.
See what moved in solar in California each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in solar in California, from new entries to projects that came off the list.
Email me solar in California queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 942 | 140,018 MW |
By status, as published
| Status | Projects |
|---|---|
| WITHDRAWN | 750 |
| COMPLETED | 119 |
| ACTIVE | 73 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| KERN | 236 | 36,401 MW |
| FRESNO | 146 | 13,057 MW |
| SAN BERNARDINO | 88 | 26,326 MW |
| RIVERSIDE | 82 | 19,877 MW |
| KINGS | 73 | 8,602 MW |
| LOS ANGELES | 64 | 5,774 MW |
| SAN DIEGO | 39 | 2,144 MW |
| IMPERIAL | 37 | 8,856 MW |
| MERCED | 29 | 3,848 MW |
| TULARE | 28 | 2,944 MW |
| STANISLAUS | 18 | 1,819 MW |
| SAN JOAQUIN | 11 | 805 MW |
| MADERA | 10 | 942 MW |
| SAN LUIS OBISPO | 9 | 1,380 MW |
| ALAMEDA | 7 | 448 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| SES SOLAR SIX | CAISO | SAN BERNARDINO | 1,400 | WITHDRAWN | 2006-06-16 | not published |
| SES SOLAR SEVEN | CAISO | SAN BERNARDINO | 1,200 | WITHDRAWN | 2006-08-09 | not published |
| WINGTIP SOLAR 1 | CAISO | MERCED | 1,150 | ACTIVE | 2021-04-15 | not published |
| ALTA 13 | CAISO | SAN BERNARDINO | 1,150 | WITHDRAWN | 2008-05-30 | not published |
| CITY OF VERNON RENEWABLE PROJECT 2 | CAISO | KERN | 1,100 | WITHDRAWN | 2009-07-31 | not published |
| SUNCREST IMPERIAL SEGS | CAISO | IMPERIAL | 1,080 | WITHDRAWN | 2011-03-31 | not published |
| CENTRAL VALLEY I SEGS | CAISO | KERN | 1,080 | WITHDRAWN | 2011-03-31 | not published |
| HEARTLAND SOLAR | CAISO | FRESNO | 1,043 | WITHDRAWN | 2016-05-02 | not published |
| HEARTLAND SOLAR-2 | CAISO | FRESNO | 1,042 | WITHDRAWN | 2016-05-02 | not published |
| ATLAS | CAISO | FRESNO | 1,000 | WITHDRAWN | 2018-04-16 | not published |
| PLUM | CAISO | KINGS | 1,000 | ACTIVE | 2021-04-15 | not published |
| DESERT OPAL III PV | CAISO | SAN BERNARDINO | 1,000 | WITHDRAWN | 2007-06-21 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.