Interconnection queue › Connecticut › Gas
Gas Projects in the Connecticut Interconnection Queue
Snapshot of 2026-09-07 · 61 projects
61 gas projects are in the interconnection queue with a Connecticut location, totaling 3,516 MW across the 44 that publish a capacity.
See what moved in gas in Connecticut each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in gas in Connecticut, from new entries to projects that came off the list.
Email me gas in Connecticut queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 61 | 3,516 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 61 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| Fairfield | 22 | 2,270 MW |
| New Haven | 19 | 430 MW |
| Windham | 5 | 506 MW |
| Hartford | 5 | 54 MW |
| New London | 4 | 253 MW |
| Litchfield | 3 | 4 MW |
| Tolland | 1 | not published |
| Middlesex | 1 | not published |
| (not published) | 1 | not published |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| Combined Cycle | ISO-NE | Fairfield | 745 | not published | 6/8/2011 | 6/1/2016 |
| Combined Cycle | ISO-NE | Fairfield | 680 | not published | 1/13/2012 | 5/31/2016 |
| Gas Turbine | ISO-NE | Fairfield | 325 | not published | 6/30/2006 | 9/30/2010 |
| Combined Cycle | ISO-NE | Windham | 250 | not published | 2/27/2007 | 5/31/2013 |
| Gas Turbine | ISO-NE | Fairfield | 233 | not published | 5/3/2023 | 6/1/2026 |
| Combined Cycle | ISO-NE | New London | 223 | not published | 7/5/2006 | 5/31/2013 |
| Combined Cycle Capacity Increase (See QP #202) | ISO-NE | Windham | 161 | not published | 8/13/2007 | 5/31/2013 |
| Combustion Turbine | ISO-NE | Fairfield | 102 | not published | 4/25/2016 | 6/1/2019 |
| Wallingford Energy Center | ISO-NE | New Haven | 100 | not published | 2/24/2014 | 5/9/2018 |
| Waterbury Generating Facility | ISO-NE | New Haven | 96 | not published | 2/21/2007 | 6/26/2009 |
| Bridgeport Energy Uprate | ISO-NE | Fairfield | 84 | not published | 6/16/2014 | 6/5/2015 |
| Beacon Falls Energy Park | ISO-NE | New Haven | 63 | not published | 2/13/2015 | 4/1/2022 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.