Interconnection queue › Connecticut › Solar
Solar Projects in the Connecticut Interconnection Queue
Snapshot of 2026-09-07 · 56 projects
56 solar projects are in the interconnection queue with a Connecticut location, totaling 1,487 MW across the 56 that publish a capacity.
See what moved in solar in Connecticut each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in solar in Connecticut, from new entries to projects that came off the list.
Email me solar in Connecticut queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 56 | 1,487 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 56 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| Hartford | 25 | 992 MW |
| Windham | 11 | 259 MW |
| New London | 7 | 111 MW |
| New Haven | 4 | 40 MW |
| Litchfield | 3 | 44 MW |
| Tolland | 3 | 28 MW |
| Fairfield | 1 | 5 MW |
| Ellington | 1 | 6 MW |
| Putnam | 1 | 2 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| Solar | ISO-NE | Hartford | 150 | not published | 3/31/2022 | 10/31/2028 |
| Solar | ISO-NE | Hartford | 135 | not published | 9/10/2020 | 10/31/2022 |
| Solar | ISO-NE | Hartford | 101 | not published | 8/16/2021 | 10/15/2024 |
| Broadleaf Solar | ISO-NE | Hartford | 101 | not published | 11/4/2021 | 10/15/2027 |
| Solar | ISO-NE | Hartford | 101 | not published | 8/16/2021 | 10/15/2024 |
| Solar | ISO-NE | Windham | 63 | not published | 6/28/2016 | 7/1/2018 |
| Husky Solar | ISO-NE | Windham | 50 | not published | 6/3/2021 | 5/10/2030 |
| Solar | ISO-NE | Hartford | 50 | not published | 10/26/2018 | 11/1/2022 |
| Gravel Pit Solar | ISO-NE | Hartford | 50 | not published | 6/12/2019 | 8/13/2025 |
| Quinebaug Solar | ISO-NE | Windham | 49 | not published | 1/7/2016 | 12/18/2021 |
| Gravel Pit Solar Increase | ISO-NE | Hartford | 45 | not published | 6/2/2020 | 8/13/2025 |
| Solar | ISO-NE | Hartford | 26 | not published | 2/21/2018 | 12/10/2019 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.