Hydro Projects in the Massachusetts Interconnection Queue
Snapshot of 2026-09-07 · 24 projects
24 hydro projects are in the interconnection queue with a Massachusetts location, totaling 258 MW across the 23 that publish a capacity.
See what moved in hydro in Massachusetts each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in hydro in Massachusetts, from new entries to projects that came off the list.
Email me hydro in Massachusetts queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 24 | 258 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 24 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| Franklin | 8 | 100 MW |
| Berkshire | 7 | 152 MW |
| Hampden | 7 | 6 MW |
| Franklin and Berkshire | 1 | 0 MW |
| Franklin and Bershire | 1 | 0 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| Bear Swamp Unit 1 and 2 Upgrade | ISO-NE | Berkshire | 66 | not published | 1/21/2016 | 1/6/2023 |
| Bear Swamp Uprate - First Unit | ISO-NE | Berkshire | 43 | not published | 9/26/2007 | 3/31/2012 |
| Pump Storage Capacity Upgrade | ISO-NE | Berkshire | 43 | not published | 9/26/2007 | 3/30/2013 |
| Northfield Mt Upgrade #3 | ISO-NE | Franklin | 25 | not published | 1/16/2007 | 6/17/2011 |
| Northfield Mt Upgrade #1 | ISO-NE | Franklin | 25 | not published | 1/16/2007 | 2/18/2016 |
| Northfield Mt. Upgrade #2 | ISO-NE | Franklin | 25 | not published | 1/16/2007 | 5/25/2012 |
| Northfield Mt. Upgrade #4 | ISO-NE | Franklin | 25 | not published | 1/16/2007 | 5/21/2014 |
| Hydro | ISO-NE | Hampden | 3 | not published | 7/13/2009 | 4/1/2014 |
| Indian River Power | ISO-NE | Hampden | 1 | not published | 7/14/2008 | 8/2/2011 |
| Cresent Hydroelectric Project Uprate | ISO-NE | Hampden | 1 | not published | 10/20/2009 | 6/8/2012 |
| Overflow #3 | ISO-NE | Hampden | 0 | not published | 7/13/2009 | 11/30/2013 |
| Glendale Hydroelectric Expansion Project | ISO-NE | Berkshire | 0 | not published | 2/25/2014 | 11/13/2018 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.