Interconnection queue › Maine › Hybrid
Hybrid Projects in the Maine Interconnection Queue
Snapshot of 2026-09-07 · 24 projects
24 hybrid projects are in the interconnection queue with a Maine location, totaling 740 MW across the 24 that publish a capacity.
See what moved in hybrid in Maine each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in hybrid in Maine, from new entries to projects that came off the list.
Email me hybrid in Maine queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 24 | 740 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 24 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| Kennebec | 7 | 59 MW |
| Oxford | 3 | 136 MW |
| York | 3 | 42 MW |
| Knox | 2 | 5 MW |
| Cumberland | 1 | 5 MW |
| Androscoggin | 1 | 8 MW |
| Howard | 1 | 5 MW |
| Somerset/Kennebec | 1 | 19 MW |
| Oxford/Androscoggin | 1 | 52 MW |
| York/Oxford/Cumberland | 1 | 8 MW |
| Piscataquis/Penobscot/Somerset/Waldo/Hancock | 1 | 58 MW |
| Aroostook | 1 | 205 MW |
| Penoboscot | 1 | 139 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| Solar plus Battery | ISO-NE | Aroostook | 205 | not published | 8/9/2022 | 11/28/2025 |
| Solar and Battery | ISO-NE | Penoboscot | 139 | not published | 4/13/2023 | 12/31/2028 |
| Solar plus Battery | ISO-NE | Oxford | 129 | not published | 3/25/2022 | 12/31/2029 |
| Detroit/Guilford/Belfast DG Area Study | ISO-NE | Piscataquis/Penobscot/Somerset/Waldo/Hancock | 58 | not published | 5/2/2022 | 12/31/2027 |
| Lewiston CMP Cluster 5 | ISO-NE | Oxford/Androscoggin | 52 | not published | 3/28/2022 | 6/30/2028 |
| Sanford/Quaker Hill CMP Cluster 4 | ISO-NE | York | 21 | not published | 3/28/2022 | 6/30/2028 |
| CMP Winslow 115 kV SS - Winslow-Lakewood Areas Study | ISO-NE | Somerset/Kennebec | 19 | not published | 2/4/2021 | 4/30/2024 |
| Augusta E/Puddledock/Bowman St 115 kV SS - Midcoast Area DG Study | ISO-NE | Kennebec | 19 | not published | 12/5/2023 | 12/31/2024 |
| Solar and Battery | ISO-NE | York | 12 | not published | 8/29/2019 | 12/31/2020 |
| Bowman Street 115 kV SS - Augusta Area Study | ISO-NE | Kennebec | 10 | not published | 10/2/2020 | 12/30/2022 |
| Bowman Street 115 kV SS - Augusta Area Study | ISO-NE | Kennebec | 9 | not published | 10/2/2020 | 3/28/2023 |
| Solar and Battery | ISO-NE | York | 9 | not published | 8/29/2019 | 12/31/2020 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.